Manchester, NH BOND Building Construction and e4H Architecture, recently unveiled a new hospital wing of the future at Elliot Hospital. The wing features advanced infection control with state-of-the-art negative pressure rooms and HVAC technology, allowing providers to better isolate infectious patients, increase ventilation and air filtration systems, and provide additional oxygen ports to care for an increased number of patients, making it better equipped to handle future surges in demand for care.
Adding on 22,000 s/f to the existing Emergency Department, the new ED also features:
• 32 private exam rooms;
• Three trauma rooms; and
• Nine rapid triage and treatment chairs, allowing 8,000 more patients to be treated annually.
BOND is working with healthcare networks across the northeast to build more hospitals that will be better prepared for the next pandemic.