News: Rhode Island

Payette designs 139,000 s/f CBLS and 147,000 s/f COP at URI's Kingston campus

Payette is designing two buildings on the University of Rhode Island (URI) campus. All of the buildings constructed as part of, or abutting, the north district of the campus will be certified LEED Silver. Payette has designed both the $55 million Center for Biotechnology and Life Sciences (CBLS) and the $65 million College of Pharmacy (COP) which is currently in the design development phase. These two buildings will be the first and second phases of a larger north district master plan, creating two new quads for the life sciences on the URI Kingston campus. Both projects include teaching and research labs which will provide both students and faculty hands-on interactive learning environments. The 139,000 s/f CBLS building will feature a four-story atrium which will bridge a research wing and a teaching wing. The 147,000 s/f COP project will include three distinct and connected neighborhoods. These "social centers" will face south on the relocated Medicinal Garden which exemplifies the COP's history concerning the study and research of natural products. "It's so exciting to see the tremendous progress being made every day on the Center for Biotechnology and Life Sciences. It already has quite an impressive presence on campus," said URI president Robert Carothers during a ceremony celebrating the topping out of the structure. Located on the northernmost section of the Kingston campus, the approximately 25-acre district is contoured with more than 54 feet of grade difference from the east to west section of the site. "I have been a proponent of this project since I was first elected," said governor Donald Carcieri. The CBLS will set the standard for modern laboratory facilities at URI, housing state-of-the-art research and teaching spaces that will replace outdated facilities in the Biological Sciences Building, Ranger Hall, Morrill Hall, and the DeWolf Laboratory. When completed, the CBLS will house 30 faculty members and their research groups, as well as teaching labs and classrooms for life science education, enabling the removal of the existing Biological Sciences Building and creation of an open space campus quad in its place. "We're pleased to have been chosen to design these precedent-setting buildings at the university," said Todd Sloane, AIA, associate principal at Payette. Payette worked with Lerner, Ladds & Bartels, associate architect, and the construction manager Gilbane Building Company. Vanderweil Engineers provided mechanical, electrical and plumbing services. The structural engineer was Simpson Gumpertz & Heger for the CBLS building and Odeh Engineering for the COP building. Pare Corp. served as the civil engineer and Carol R. Johnson Associates designed the landscaping.
READ ON THE GO
DIGITAL EDITIONS
Subscribe
READ ON THE GO
DIGITAL EDITIONS
Subscribe
STAY INFORMED FOR $9.99/Mo.
NEREJ PRINT EDITION
Stay Informed
STAY CONNECTED
SIGN-UP FOR NEREJ EMAILS
Newsletter
Columns and Thought Leadership
Shawmut Design and Construction breaks ground on the 195 District Park Pavilion in Providence, RI

Shawmut Design and Construction breaks ground on the 195 District Park Pavilion in Providence, RI

Providence, RI Shawmut Design and Construction celebrated the ceremonial groundbreaking for the 195 District Park Pavilion, marking the start of construction on a facility that will feature year-round dining and support space for park operations. In addition to the 3,500 s/f building, the project will include infrastructure upgrades
The New England Real Estate Journal presents<br> the First Annual Project of the Year Award! Vote today!

The New England Real Estate Journal presents
the First Annual Project of the Year Award! Vote today!

The New England Real Estate proud to showcase the remarkable projects that have graced the cover and center spread of NEREJ this year, all made possible by the collaboration of outstanding project teams. Now, it's time to recognize the top project of 2024, and we need your vote!
Investing in a falling rate environment - by Harrison Klein

Investing in a falling rate environment - by Harrison Klein

Long-term interest rates have fallen by 100 basis points, and the market is normalizing. In December of 2022 I wrote an article about investing in a high interest rate, high inflation market. Since then, inflation has cooled off, and the Fed has begun lowering their funds rate.
The 2024 CRE markets: “The Ups” (industrial) and “The Downs” (Boston class B/C office) - by Webster Collins

The 2024 CRE markets: “The Ups” (industrial) and “The Downs” (Boston class B/C office) - by Webster Collins

The industrial markets have never been stronger. What has happened is that the build out of Devens with new high-tech biotech manufacturing with housing to service these buildings serves as the connector required to really make the I-495 West market sizzle. Worcester has been the beneficiary