News: Construction Design & Engineering

Integrated Builders tops-off 48,000 s/f Rockland office/warehouse building

Weymouth Street - Rockland, Mass. Weymouth Street - Rockland, MA

Rockland, MA Integrated Builders has added the last steel beam to the roof of the 48,000 s/f office and warehouse under construction on Weymouth St.

Integrated Builders is building the new corporate office from the ground-up with a structural steel frame and insulated wall panels. The firm will also add phenolic wood siding to the exterior, and it will feature a modern glass facade. The interior will have modern art and architectural finishes such as wood slats and ceiling decor. The new space will have a unique open office concept with glass dividers throughout, and exposed structural steel. Additionally, the office area will lead to an outside deck intended for corporate socials.

In addition to the 38,000 s/f office, Integrated Builders will erect a 10,000 s/f warehouse that will be used for product storage. The warehouse will contain a designated area to repair and perform maintenance on products. There will also be a small retail space in the front of the building for walk-in and direct-to-consumer sales from the warehouse inventory.

The Integrated Builders team includes project manager Dean Kelliher, assistant project manager Barbara Frazier, and superintendent Herbe Volpe who collaborated with civil engineers Grady Consulting and architects Bergmeyer Associates.

MORE FROM Construction Design & Engineering
Construction Design & Engineering

Weston & Sampson earns award from ACEC for Arlington DPW job

Arlington, MA Weston & Sampson Engineers, Inc., has earned a National Recognition Award for exemplary engineering achievement in the American Council of Engineering Companies’ (ACEC) 58th annual Engineering Excellence Awards (EEA). The award comes for leading the renovation of the Arlington Department of Public Works (DPW) facility.
READ ON THE GO
DIGITAL EDITIONS
Subscribe
Columns and Thought Leadership
Ask the Electrician:  How do I prepare my commercial building for a disaster?

Ask the Electrician: How do I prepare my commercial building for a disaster?

New England’s notorious weather – from fierce winter storms to summer squalls and fall hurricanes – can leave businesses in the dark. While power outages are often blamed on storms, they can also be caused by unforeseen events like accidents or construction mishaps. While it’s impossible to prevent disasters and power outages entirely, proactive preparation can significantly minimize their impact on your commercial building.
Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

The answer is “Yes!” While January marks the official new year, many businesses view September as a fresh start. This makes summer an ideal time for commercial property owners to schedule long-term electrical maintenance projects.
The design-build advantage: Integrated interior design solutions - by Parker Snyder

The design-build advantage: Integrated interior design solutions - by Parker Snyder

When it comes to corporate interior spaces for both commercial and industrial projects, partnering with a design-build firm with in-house interior design services can offer clients many benefits. Unlike traditional delivery methods where interior designers operate independently from the design and construction teams, often creating a longer project timeline as cost negotiations and revisions ensue
State legislature ends session without passing PLA bill - by Joe Camilo

State legislature ends session without passing PLA bill - by Joe Camilo

Massachusetts taxpayers dodged a bullet when the state Senate didn’t take up legislation passed by the House in the waning moments of the legislative session that would have made it easier for municipalities and state agencies to use union-only project labor agreements (PLAs) on construction projects.