News: Construction Design & Engineering

Timberline Construction partners with MLL Capital to renovate medical office buildings at 7 and 12 Alfred St.

 

 

Woburn, MA Partnering with MLL Capital and LK Design Group, Timberline Construction completed renovations at two medical office buildings, located at 7 and 12 Alfred St. This project took place within an occupied 112,000 s/f medical complex and included renovation of existing entries, lobbies and common areas in both buildings. 

MLL Capital’s vision was to create a first-class clinical medical office environment with a clean, contemporary aesthetic which complimented the world-class physicians and health systems (Beth Israel Lahey Health, Tufts Floating Hospital for Children and Woburn Pediatrics) currently occupying space at the property. To accomplish this, new finishes including porcelain tile and luxury vinyl tile flooring, new ceilings and lighting were selected. The building entries were reconstructed with automatic sliding glass doors to increase accessibility to the buildings and enlarge the building lobbies. The atrium of 7 Alfred was also refinished with a new aluminum and glass storefront to give the space a modern feel. The common corridors were redone to provide a modern, clean aesthetic, as tenants and visitors walk through both buildings.

 

Steve Wassersug, president of Timberline Const., said “It was a pleasure working with the MLL Capital team on this transformative project. Working in an occupied medical office building is always challenging but with careful planning and execution the project was a great success.”

According to MLL Capital’s principal acquisitions Wyndsor DePetro, “Timberline did an excellent job working through complex scheduling issues of an active medical office property, and really helped us create an environment that will attract new practices to join the medical ecosystem that already exists at the property”

Fourteen miles north of Boston and four miles north of Lahey Medical Center, the property is ready to be leased. 

MORE FROM Construction Design & Engineering
Construction Design & Engineering

Weston & Sampson earns award from ACEC for Arlington DPW job

Arlington, MA Weston & Sampson Engineers, Inc., has earned a National Recognition Award for exemplary engineering achievement in the American Council of Engineering Companies’ (ACEC) 58th annual Engineering Excellence Awards (EEA). The award comes for leading the renovation of the Arlington Department of Public Works (DPW) facility.
READ ON THE GO
DIGITAL EDITIONS
Subscribe
Columns and Thought Leadership
Ask the Electrician:  How do I prepare my commercial building for a disaster?

Ask the Electrician: How do I prepare my commercial building for a disaster?

New England’s notorious weather – from fierce winter storms to summer squalls and fall hurricanes – can leave businesses in the dark. While power outages are often blamed on storms, they can also be caused by unforeseen events like accidents or construction mishaps. While it’s impossible to prevent disasters and power outages entirely, proactive preparation can significantly minimize their impact on your commercial building.
Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

The answer is “Yes!” While January marks the official new year, many businesses view September as a fresh start. This makes summer an ideal time for commercial property owners to schedule long-term electrical maintenance projects.
State legislature ends session without passing PLA bill - by Joe Camilo

State legislature ends session without passing PLA bill - by Joe Camilo

Massachusetts taxpayers dodged a bullet when the state Senate didn’t take up legislation passed by the House in the waning moments of the legislative session that would have made it easier for municipalities and state agencies to use union-only project labor agreements (PLAs) on construction projects.
The design-build advantage: Integrated interior design solutions - by Parker Snyder

The design-build advantage: Integrated interior design solutions - by Parker Snyder

When it comes to corporate interior spaces for both commercial and industrial projects, partnering with a design-build firm with in-house interior design services can offer clients many benefits. Unlike traditional delivery methods where interior designers operate independently from the design and construction teams, often creating a longer project timeline as cost negotiations and revisions ensue