Code consulting: Protecting buildings from hazardous materials is confusing - by Andy Shanahan

Andy Shanahan

As a code consultant, one of the most frequently asked about subjects is hazardous material compliance because there is often confusion about how to protect a building from the hazards associated with flammable, combustible, and other hazardous materials. This is, in part, because the Massachusetts State Building Code and Massachusetts Comprehensive Fire Safety Code have separate, and sometimes conflicting, strategies for how to protect these types of materials. 

Hazardous materials can require enhanced fire-resistive-rated construction. They can also require improvements to the mechanical, electrical, and plumbing systems and the fire alarm and fire protection systems. Without properly addressing the hazardous materials, these improvements can be missed, resulting in permit comments and costly redesigns. 

Navigating these conflicting standards requires an understanding of the chemicals in the space and their proposed quantities. Without this information, the design team cannot accommodate fire protection and life safety-related upgrades that may be required because of the hazards. 

An under-utilized tool to assist the design team is the hazardous materials inventory statement. This is a required document by 780 CMR, Section 414.1.3. This report must be prepared by a “qualified person” (a person with expertise in the code) and outline the chemicals, classification, quantity, and the building’s proposed protection methods from such hazards. This is required by 780 CMR for any building containing hazardous materials – not just if they are in great enough quantity to require mitigation.”

Hazardous material compliance requires experience in many different areas – ranging from chemistry and lab safety to code compliance and architecture. We have experts on our team that can help address hazardous materials early on in the design process, helping to make informed decisions about the space. We can also help to develop a flexible design – one that can handle the variable challenges facilities may face in the coming weeks, months, and years. 

Andy Shanahan is a senior project manager with WB Engineers+Consultants,  Boston.

MORE FROM Construction Design & Engineering
Construction Design & Engineering

Weston & Sampson earns award from ACEC for Arlington DPW job

Arlington, MA Weston & Sampson Engineers, Inc., has earned a National Recognition Award for exemplary engineering achievement in the American Council of Engineering Companies’ (ACEC) 58th annual Engineering Excellence Awards (EEA). The award comes for leading the renovation of the Arlington Department of Public Works (DPW) facility.
READ ON THE GO
DIGITAL EDITIONS
Subscribe
Columns and Thought Leadership
Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

The answer is “Yes!” While January marks the official new year, many businesses view September as a fresh start. This makes summer an ideal time for commercial property owners to schedule long-term electrical maintenance projects.
Ask the Electrician:  How do I prepare my commercial building for a disaster?

Ask the Electrician: How do I prepare my commercial building for a disaster?

New England’s notorious weather – from fierce winter storms to summer squalls and fall hurricanes – can leave businesses in the dark. While power outages are often blamed on storms, they can also be caused by unforeseen events like accidents or construction mishaps. While it’s impossible to prevent disasters and power outages entirely, proactive preparation can significantly minimize their impact on your commercial building.
State legislature ends session without passing PLA bill - by Joe Camilo

State legislature ends session without passing PLA bill - by Joe Camilo

Massachusetts taxpayers dodged a bullet when the state Senate didn’t take up legislation passed by the House in the waning moments of the legislative session that would have made it easier for municipalities and state agencies to use union-only project labor agreements (PLAs) on construction projects.
The design-build advantage: Integrated interior design solutions - by Parker Snyder

The design-build advantage: Integrated interior design solutions - by Parker Snyder

When it comes to corporate interior spaces for both commercial and industrial projects, partnering with a design-build firm with in-house interior design services can offer clients many benefits. Unlike traditional delivery methods where interior designers operate independently from the design and construction teams, often creating a longer project timeline as cost negotiations and revisions ensue