News: Construction Design & Engineering

J&M Brown Co. underway with electrical construction at The BEAT

Dorchester, MA  J&M Brown Company, Inc. (JMB) is underway with the core and shell electrical construction of The BEAT, the former headquarters of the Boston Globe at 135 Morissey Blvd.

The Nordblom Company’s redevelopment project will transform the 695,000 s/f building into an “urban innovation campus,” as the existing three-story office and industrial building will be retrofit to incorporate 360,000 s/f of office space and 300,000 s/f of flex/light industrial space, customized to accommodate, and spur innovation in such fields as robotics, life science, and high tech manufacturing.  The project will also include a 10,000 s/f fitness center, a brewery and a 100-seat restaurant.  Integral to the building’s design is a new multi-story atrium that will be constructed at The BEAT’s entrance, creating a central gathering area, complete with a food hall and collaborative meeting and gathering spaces.

Project team includes architect Stantec and general contractor Moriarty.

The comprehensive electrical scope includes demolition of the building’s normal and emergency electrical distribution system and the installation of new primary and emergency power.  JMB will also furnish and install a new 15kV electrical service, a 480 Volt normal electrical distribution system and a 480 Volt emergency distribution system.  The NECA Boston contractor will also install The BEAT’s lighting and lighting control systems as well as the building’s new Autocall fire alarm system.

J&M Brown’s vice president Bryan Greene, project manager Mike Booker and general foreman Phil Talbot are heading the project team, supervising a field crew expected to range upwards of 40 IBEW Local 103 electricians at peak construction.  The project is targeting completion in the summer of 2020.

The project name, “The BEAT,” an acronym for The Boston Exchange for Accelerated Technology, also pays tribute to the reporters that worked at the Globe headquarters location for more than 60 years.

rendering credit Stantec and Nordblom Co.

MORE FROM Construction Design & Engineering
Construction Design & Engineering

Weston & Sampson earns award from ACEC for Arlington DPW job

Arlington, MA Weston & Sampson Engineers, Inc., has earned a National Recognition Award for exemplary engineering achievement in the American Council of Engineering Companies’ (ACEC) 58th annual Engineering Excellence Awards (EEA). The award comes for leading the renovation of the Arlington Department of Public Works (DPW) facility.
READ ON THE GO
DIGITAL EDITIONS
Subscribe
Columns and Thought Leadership
The design-build advantage: Integrated interior design solutions - by Parker Snyder

The design-build advantage: Integrated interior design solutions - by Parker Snyder

When it comes to corporate interior spaces for both commercial and industrial projects, partnering with a design-build firm with in-house interior design services can offer clients many benefits. Unlike traditional delivery methods where interior designers operate independently from the design and construction teams, often creating a longer project timeline as cost negotiations and revisions ensue
Ask the Electrician:  How do I prepare my commercial building for a disaster?

Ask the Electrician: How do I prepare my commercial building for a disaster?

New England’s notorious weather – from fierce winter storms to summer squalls and fall hurricanes – can leave businesses in the dark. While power outages are often blamed on storms, they can also be caused by unforeseen events like accidents or construction mishaps. While it’s impossible to prevent disasters and power outages entirely, proactive preparation can significantly minimize their impact on your commercial building.
State legislature ends session without passing PLA bill - by Joe Camilo

State legislature ends session without passing PLA bill - by Joe Camilo

Massachusetts taxpayers dodged a bullet when the state Senate didn’t take up legislation passed by the House in the waning moments of the legislative session that would have made it easier for municipalities and state agencies to use union-only project labor agreements (PLAs) on construction projects.
Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

The answer is “Yes!” While January marks the official new year, many businesses view September as a fresh start. This makes summer an ideal time for commercial property owners to schedule long-term electrical maintenance projects.