News: Construction Design & Engineering

Hopkins Architects and Bruner/Cott complete Smith Campus Center at Harvard University

Cambridge, MA The Richard and Susan Smith Campus Center recently opened at Harvard University. Designed by Hopkins Architects, who partnered with local executive architects Bruner/Cott, the 96,242 s/f project is a radical re-appraisal of the ten-story, 1966 Holyoke Center building designed by Josep Lluis Sert. It is part of a wider, ongoing “Common Spaces” initiative by the university to ensure its physical spaces foster the campus’s intellectual, cultural, and social experience and support the wider community.

Realized in consultation with Arup, the project reconfigures the first, second, and tenth floors, reinterpreting the history and logic of Sert’s architecture in a series of additions to and removals from the existing fabric to create a family of new internal spaces, interspersed with a captured internal and external landscape designed by Michael Van Valkenburgh Associates.

The new Moise Y. Safra Welcome Pavilion at the front of the building creates a front door for the university and re-establishes a stronger connection between Sert’s Arcade and Harvard Yard. In the Arcade, by the careful removal of existing concrete fabric, light and view and landscape have been introduced into the heart of the building, changing the singular linearity of the Arcade while allowing its defining order to remain. A series of internal and external landscape “thresholds” mediate between the Arcade and the new Harvard Commons space—the central room of the Campus Center, around which are gathered a series of social and meeting spaces of a variety of scale and character.

The tenth floor has been completely re-organized to provide a flexible suite of formal and informal gathering spaces that openly engage Sert’s building with the campus, the Charles River, and the city of Cambridge beyond.

Hopkins senior partner Andy Barnett said “The Campus Center project has been an opportunity for us to create a new place for the university to come together, responding to Sert’s architecture in a manner that is bold, transformative and dynamic, but which, with each intervention, is grounded in and sympathetic to the history and design of the building.”

Bruner/Cott principal Henry Moss said “Bruner/Cott was pleased to partner with Hopkins Architects to realize their design plans for this seminal project. Our firm has worked with Harvard for more than thirty years on diverse initiatives including other Sert designs, so it was a pleasure to continue this relationship.”

Tanya Iatridis, senior director of University Planning said “Harvard’s beautiful new Smith Campus Center serves as the front door to our campus, and we’re incredibly grateful to the excellent work done by the Hopkins team as design architect and Bruner/Cott as executive architect. Their respect for Sert’s work, his vision of what the space means, and how it can work to enhance and enliven the area was extraordinary. The final product is a testament to the care and attention to detail they displayed throughout the project. We’re confident that the space will greatly enhance the public realm, create a usable year-round amenity, and result in a more cohesive and collaborative community.”

MORE FROM Construction Design & Engineering

Weston & Sampson earns award from ACEC for Arlington DPW job

Arlington, MA Weston & Sampson Engineers, Inc., has earned a National Recognition Award for exemplary engineering achievement in the American Council of Engineering Companies’ (ACEC) 58th annual Engineering Excellence Awards (EEA).
READ ON THE GO
DIGITAL EDITIONS
Subscribe
Columns and Thought Leadership
The design-build advantage: Integrated interior design solutions - by Parker Snyder

The design-build advantage: Integrated interior design solutions - by Parker Snyder

When it comes to corporate interior spaces for both commercial and industrial projects, partnering with a design-build firm with in-house interior design services can offer clients many benefits. Unlike traditional delivery methods where interior designers operate independently from the design and construction teams, often creating a longer project timeline as cost negotiations and revisions ensue
Careers in Construction Month focus on training and safety - by Joe Camilo

Careers in Construction Month focus on training and safety - by Joe Camilo

October is Careers in Construction Month, and rarely has it been more consequential. According to our chapter’s national parent organization, the construction industry needs to attract half-a-million new workers in the coming year to meet demand. Addressing that need is a huge job, but we at ABC MA are trying to do our part.
The rise of incubators and co-working spaces: The latest in life sciences - by Matt Combs

The rise of incubators and co-working spaces: The latest in life sciences - by Matt Combs

In recent years, the life science industry has witnessed a shift in how companies operate and innovate. One of the key driving forces behind this transformation is the emergence of incubators and co-working spaces specifically tailored to meet the unique budget and schedule needs of startups.
Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

The answer is “Yes!” While January marks the official new year, many businesses view September as a fresh start. This makes summer an ideal time for commercial property owners to schedule long-term electrical maintenance projects.