News: Construction Design & Engineering

Colantonio completes 57,000 s/f DeCristofaro Learning
Center - design by Wessling Architects

Quincy, MA Construction manager Colantonio Inc. has completed the Dr. Rick DeCristofaro Learning Center. The 57,000 s/f building, which serves special needs children throughout the South Shore, was designed by Wessling Architects. PCA360 served as the owner’s project manager. Located adjacent to Central Middle School and a daycare center, the new educational facility is housed within a renovated and expanded 1920s building that formerly served as a furniture warehouse, an ice cream and candy factory, and a college.

The DeCristofaro Learning Center features art, music, sensory, physical, and occupational therapy spaces, a life skills room designed as a mini-apartment with washer/dryer, stove, microwave, and oven; a small three-lane indoor track for motor skills development, and two multipurpose rooms. Each classroom houses an ADA-compliant bathroom, some with bidets. 

 

 

Exterior murals by local resident Brandon Eames feature whales, dolphins, turtles and other sea life, while the interior offers a soothing color palette and place-making graphics depicting different natural settings, including a water world, a rainforest, and representations of the four seasons. 

The scope of work included renovation of the existing 50,500 s/f two- and three-story masonry building, construction of a 6,500 s/f addition, mechanical and electrical upgrades, windows repairs, and replacements. A partial demolition of the existing building allowed for construction of two new elevators. The brick façade was repointed and reinstalled, and extensive sitework was accomplished, including underground utilities, earthwork, and landscaping. A playground, specifically designed to accommodate needs of autistic and disabled children, was also introduced. 

Sustainability was a key focus for the team, with features including:

• Electric vehicle charging stations (capable of charging 4 vehicles);

• LED light fixtures;

• High-efficiency gas boilers;

• Water source heat pumps;

• Fluid cooler; and 

• Waterside economizers on the fan coil units.

“It was a privilege to work on this project, which brings much needed services to the children of Quincy and the South Shore. The successful transformation of this century-old building into a modern and sustainable educational facility is a testament to the hard work and skill of the entire project team,” said Colantonio president George Willwerth.

MORE FROM Construction Design & Engineering
Construction Design & Engineering

Weston & Sampson earns award from ACEC for Arlington DPW job

Arlington, MA Weston & Sampson Engineers, Inc., has earned a National Recognition Award for exemplary engineering achievement in the American Council of Engineering Companies’ (ACEC) 58th annual Engineering Excellence Awards (EEA). The award comes for leading the renovation of the Arlington Department of Public Works (DPW) facility.
READ ON THE GO
DIGITAL EDITIONS
Subscribe
Columns and Thought Leadership
Ask the Electrician:  How do I prepare my commercial building for a disaster?

Ask the Electrician: How do I prepare my commercial building for a disaster?

New England’s notorious weather – from fierce winter storms to summer squalls and fall hurricanes – can leave businesses in the dark. While power outages are often blamed on storms, they can also be caused by unforeseen events like accidents or construction mishaps. While it’s impossible to prevent disasters and power outages entirely, proactive preparation can significantly minimize their impact on your commercial building.
State legislature ends session without passing PLA bill - by Joe Camilo

State legislature ends session without passing PLA bill - by Joe Camilo

Massachusetts taxpayers dodged a bullet when the state Senate didn’t take up legislation passed by the House in the waning moments of the legislative session that would have made it easier for municipalities and state agencies to use union-only project labor agreements (PLAs) on construction projects.
The design-build advantage: Integrated interior design solutions - by Parker Snyder

The design-build advantage: Integrated interior design solutions - by Parker Snyder

When it comes to corporate interior spaces for both commercial and industrial projects, partnering with a design-build firm with in-house interior design services can offer clients many benefits. Unlike traditional delivery methods where interior designers operate independently from the design and construction teams, often creating a longer project timeline as cost negotiations and revisions ensue
Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

The answer is “Yes!” While January marks the official new year, many businesses view September as a fresh start. This makes summer an ideal time for commercial property owners to schedule long-term electrical maintenance projects.