News: Construction Design & Engineering

Acentech and Commodore Builders complete Continuum’s headquarters

Continuum’s new 50,000 s/f office in Boston Seaport’s Innovation and Design Building, Continuum headquarters, Boston, MA

Boston, MA Acentech, Commodore Builders, Höweler + Yoon Architecture, and STV|DPM completed a new global headquarters for Continuum, a global innovation design consultancy. The firms jointly provided design, consulting, and construction services for Continuum’s new 50,000 s/f office in Boston Seaport’s Innovation and Design Building, a 1.4 million s/f mixed-use complex attracting a mix of companies and industries. Completed in June 2016, Continuum’s workspace supports the firm’s identity as a pioneering design and innovation company, developing products, services, and experiences that improve people’s lives around the world.

Relocating its 120 employees from West Newton,  Continuum sought to create an open work environment with opportunities for collaboration and space for client interaction. Designed by Höweler + Yoon and built by Commodore Bldrs., the office supports the work patterns of Continuum’s interdisciplinary design practice, balancing the need for open and informal spaces for interaction and collaboration, discrete private spaces for individual work and small group meetings, and public spaces for visitor tours, large meetings, and events. Acentech provided acoustical, audiovisual and IT system design for the project, ensuring that technological amenities and proper acoustics were seamlessly integrated throughout the space. STV|DPM provided lease review, design/construction oversight, FF&E (furniture fixtures and equipment) coordination, and move management for Continuum’s new office.

To extend creativity into the office environment and company workflow, Höweler + Yoon’s design strategy took two approaches: workshops, laboratories, and flexible collaboration areas are located in the center of the office, allowing circulation to pass through these spaces, and project rooms, open plan work areas, and public spaces are placed on the periphery. Continuum’s Made Real Lab in the center serve as part laboratory and part showroom to create an intermediate zone between public areas and private project rooms. The deliberate sequencing of rooms allows visitors and employees alike the opportunity to observe how people interact with products and environments.

To ensure speech privacy in the open spaces and sound isolation from noisy equipment, Acentech provided guidance to keep these open, collaborative spaces free from distractions. Proper room finishes, sound absorptive features, desk configurations, and mechanical system noise control all contribute to the workability of these large areas. Audiovisual features such as live streaming, web conferencing, large screen displays, speech reinforcement, audio playback, ADA-compliant assistive listening, system controls, and digital signage, including a video wall in the lobby, are all components in this workspace. A premium 10G structured cabling system was designed for the intense amounts of bandwidth on the corporate networks and to support streaming digital video. The structured cabling system is flexible, expanding to support Continuum’s audiovisual presentation systems when needed. These technologies were integrated into conference rooms, project suites, breakout rooms, public spaces, and the lobby. The result is a revolutionary office space that stimulates the collaboration of its diverse users.

“Our move back to Boston – and the Innovation and Design Building in particular – puts Continuum at the center of technology and design innovation, and allows us to recruit top talent in the city of Boston,” said Carmencita Bua, chief operating officer at Continuum. “This dedicated project team collaborated seamlessly to deliver a unique and edgy workspace that fits our firm, how we work, and how we innovate with our clients.”

Commodore Bldrs., the construction manager for the project, has completed several other projects for Continuum, including an expansion and a renovation project at their former headquarters, and has also worked with Höweler + Yoon  on the design of the BSA Space at Atlantic Wharf.

MORE FROM Construction Design & Engineering
Construction Design & Engineering

Weston & Sampson earns award from ACEC for Arlington DPW job

Arlington, MA Weston & Sampson Engineers, Inc., has earned a National Recognition Award for exemplary engineering achievement in the American Council of Engineering Companies’ (ACEC) 58th annual Engineering Excellence Awards (EEA). The award comes for leading the renovation of the Arlington Department of Public Works (DPW) facility.
READ ON THE GO
DIGITAL EDITIONS
Subscribe
Columns and Thought Leadership
Ask the Electrician:  How do I prepare my commercial building for a disaster?

Ask the Electrician: How do I prepare my commercial building for a disaster?

New England’s notorious weather – from fierce winter storms to summer squalls and fall hurricanes – can leave businesses in the dark. While power outages are often blamed on storms, they can also be caused by unforeseen events like accidents or construction mishaps. While it’s impossible to prevent disasters and power outages entirely, proactive preparation can significantly minimize their impact on your commercial building.
Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

The answer is “Yes!” While January marks the official new year, many businesses view September as a fresh start. This makes summer an ideal time for commercial property owners to schedule long-term electrical maintenance projects.
The design-build advantage: Integrated interior design solutions - by Parker Snyder

The design-build advantage: Integrated interior design solutions - by Parker Snyder

When it comes to corporate interior spaces for both commercial and industrial projects, partnering with a design-build firm with in-house interior design services can offer clients many benefits. Unlike traditional delivery methods where interior designers operate independently from the design and construction teams, often creating a longer project timeline as cost negotiations and revisions ensue
State legislature ends session without passing PLA bill - by Joe Camilo

State legislature ends session without passing PLA bill - by Joe Camilo

Massachusetts taxpayers dodged a bullet when the state Senate didn’t take up legislation passed by the House in the waning moments of the legislative session that would have made it easier for municipalities and state agencies to use union-only project labor agreements (PLAs) on construction projects.