News: Construction Design & Engineering

Wayne J. Griffin Electric wires new UVM residence and dining facility

Burlington, VT Wayne J. Griffin Electric, Inc. (Griffin Electric) has recently completed the electrical installation work at the University of Vermont’s (UVM) new Central Campus Residence Hall.

With capacity for 695 first-year students, the 207,000 s/f facility is located in the center of the UVM campus, adjacent to classroom and academic facilities.  Its traditional design offers a 450-seat dining facility, connector to the Bailey/Howe library, seminar rooms, and a fitness center.  It has been designed to achieve a LEED Silver designation.

Griffin Electric’s on-site work involved the installation of power and lighting, to include corresponding switchgear, power wiring and lighting. Systems for fire alarm, emergency generator and lightning protection were also setup by the team, as well as tele/data, which included communications, A/V, lighting controls and security.  Griffin utilized its in-house BIM capabilities for the electrical design of the project.

General contractor Engelberth Construction, Inc. managed the project, working alongside WTW Architects and electrical engineer H.F. Lenz Co.

MORE FROM Construction Design & Engineering
Construction Design & Engineering

Weston & Sampson earns award from ACEC for Arlington DPW job

Arlington, MA Weston & Sampson Engineers, Inc., has earned a National Recognition Award for exemplary engineering achievement in the American Council of Engineering Companies’ (ACEC) 58th annual Engineering Excellence Awards (EEA). The award comes for leading the renovation of the Arlington Department of Public Works (DPW) facility.
READ ON THE GO
DIGITAL EDITIONS
Subscribe
Columns and Thought Leadership
State legislature ends session without passing PLA bill - by Joe Camilo

State legislature ends session without passing PLA bill - by Joe Camilo

Massachusetts taxpayers dodged a bullet when the state Senate didn’t take up legislation passed by the House in the waning moments of the legislative session that would have made it easier for municipalities and state agencies to use union-only project labor agreements (PLAs) on construction projects.
Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

The answer is “Yes!” While January marks the official new year, many businesses view September as a fresh start. This makes summer an ideal time for commercial property owners to schedule long-term electrical maintenance projects.
Ask the Electrician:  How do I prepare my commercial building for a disaster?

Ask the Electrician: How do I prepare my commercial building for a disaster?

New England’s notorious weather – from fierce winter storms to summer squalls and fall hurricanes – can leave businesses in the dark. While power outages are often blamed on storms, they can also be caused by unforeseen events like accidents or construction mishaps. While it’s impossible to prevent disasters and power outages entirely, proactive preparation can significantly minimize their impact on your commercial building.
The design-build advantage: Integrated interior design solutions - by Parker Snyder

The design-build advantage: Integrated interior design solutions - by Parker Snyder

When it comes to corporate interior spaces for both commercial and industrial projects, partnering with a design-build firm with in-house interior design services can offer clients many benefits. Unlike traditional delivery methods where interior designers operate independently from the design and construction teams, often creating a longer project timeline as cost negotiations and revisions ensue