News: Construction Design & Engineering

Wayne J. Griffin Electric completes Framingham State University project

Hemenway Hall and Annex at Framingham State University - Framingham, MA Hemenway Hall and Annex at Framingham State University -
Framingham, MA

Framingham, MA The Hemenway Hall and Annex upgrade project at Framingham State University (FSU) has completed, with Wayne J. Griffin Electric, Inc. providing the on-site electrical installation work.

This 58,000 s/f infrastructure upgrade, along with a six level addition, has produced the largest academic building on FSU’s campus. The new Hemenway Laboratories are connected to the existing structure by a four-story atrium, and provides 16 new teaching laboratories, in addition to research space for the 50-year-old facility, which hosts the institution’s Family and Consumer Sciences program.

Griffin Electric was responsible for removing the existing 1000 amp service within Hemenway Hall and replacing it with 1000 amp emergency power and 1200 amp normal service, within new and existing panels located throughout the facility. Renovating the site lighting and fire alarm system within the existing structure, as well as providing new lighting and power to the six level addition was performed in phases, as the building remained occupied during construction.

The Commonwealth of Massachusetts’ Division of Capital Asset Management and Maintenance (DCAMM) authorized and oversaw the services of Barr & Barr, Inc., who served as the project’s construction manager, Ellenzweig Architects, the project’s designer of record, and BR+A, the project’s electrical engineer.

Anticipating a LEED Silver designation, recycled and locally-extracted materials were used throughout the construction, in addition to low-Volatile Organic Compound (VOC) building products and low-mercury fluorescent lighting. Storm water collection and the extensive utilization of natural daylight assisted in the promotion of renewable, clean energy at the facility.

MORE FROM Construction Design & Engineering
Construction Design & Engineering

Weston & Sampson earns award from ACEC for Arlington DPW job

Arlington, MA Weston & Sampson Engineers, Inc., has earned a National Recognition Award for exemplary engineering achievement in the American Council of Engineering Companies’ (ACEC) 58th annual Engineering Excellence Awards (EEA). The award comes for leading the renovation of the Arlington Department of Public Works (DPW) facility.
READ ON THE GO
DIGITAL EDITIONS
Subscribe
Columns and Thought Leadership
Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

The answer is “Yes!” While January marks the official new year, many businesses view September as a fresh start. This makes summer an ideal time for commercial property owners to schedule long-term electrical maintenance projects.
The design-build advantage: Integrated interior design solutions - by Parker Snyder

The design-build advantage: Integrated interior design solutions - by Parker Snyder

When it comes to corporate interior spaces for both commercial and industrial projects, partnering with a design-build firm with in-house interior design services can offer clients many benefits. Unlike traditional delivery methods where interior designers operate independently from the design and construction teams, often creating a longer project timeline as cost negotiations and revisions ensue
Ask the Electrician:  How do I prepare my commercial building for a disaster?

Ask the Electrician: How do I prepare my commercial building for a disaster?

New England’s notorious weather – from fierce winter storms to summer squalls and fall hurricanes – can leave businesses in the dark. While power outages are often blamed on storms, they can also be caused by unforeseen events like accidents or construction mishaps. While it’s impossible to prevent disasters and power outages entirely, proactive preparation can significantly minimize their impact on your commercial building.
State legislature ends session without passing PLA bill - by Joe Camilo

State legislature ends session without passing PLA bill - by Joe Camilo

Massachusetts taxpayers dodged a bullet when the state Senate didn’t take up legislation passed by the House in the waning moments of the legislative session that would have made it easier for municipalities and state agencies to use union-only project labor agreements (PLAs) on construction projects.