News: Construction Design & Engineering

Symmes Maini & McKee's design for $73 million Grafton High School honored by CEFPI

Grafton High School and Symmes Maini & McKee Associates/SMMA were honored with a Project of Distinction award by the Council of Educational Facility Planners International (CEFPI) at the association's northeast regional conference. Opened last September, the 187,000 s/f Grafton High campus is designed to support a variety of learning styles while fostering essential career skills including collaboration, critical thinking and problem solving. According to SMMA principal Philip Poinelli FAIA, the design and its integration of technology is part of a far-reaching shift away from from traditional teacher-focused models of education towards a more personalized student-centric model."The design of Grafton High dramatically departs from the familiar school environments most of us picture when we think of high school," he said. "The school uses non-traditional spaces for teaching and learning such as corridors, large and small group instruction environments as well as the outdoor classroom. The classrooms feature four teaching walls and multiple learning zones to offer all kinds of flexibility for learning beyond the traditional stand up and lecture orientation." As part of this shift, every student received a new iPad tablet last September to provide instant access to the school's digital teaching tools and wireless educational network. This 1:1 technology initiative, named to describe a dedicated mobile device for each student, is a fast-growing trend in secondary and higher education. During the design phase, students and faculty were heavily involved in the discussion of how technology could be used to improve learning and enhance school wide communication. Teachers were provided laptops and an iPad and completed a year of preparation, curriculum revisions and professional development to ensure success of the program. Education spaces and classrooms are based on a forward-thinking philosophy with flexible clusters creating small learning communities sharing common spaces for projects and interdisciplinary work. Three primary community spaces - a gymnasium, auditorium/theater and the library are linked to classrooms and common spaces by a central commons at the heart of the school. The Commons also connects to exterior campus destinations including the stadium and outdoor dining and open-air classrooms. In awarding the School this honor, the CEFPI jury described the program as one that "clearly reinforces student-centric learning." They cited how well "a large school was effectively broken down into distinct learning communities, with opportunities for real-time learning everywhere." The new $73 million Grafton High School accommodates 900 students with a flexible design expandable to 1,200 students projected for this growing community by 2030.
MORE FROM Construction Design & Engineering
CDE

Weston & Sampson earns award from ACEC for Arlington DPW job

Arlington, MA Weston & Sampson Engineers, Inc., has earned a National Recognition Award for exemplary engineering achievement in the American Council of Engineering Companies’ (ACEC) 58th annual Engineering Excellence Awards (EEA).
READ ON THE GO
DIGITAL EDITIONS
Subscribe
Columns and Thought Leadership
The rise of incubators and co-working spaces: The latest in life sciences - by Matt Combs

The rise of incubators and co-working spaces: The latest in life sciences - by Matt Combs

In recent years, the life science industry has witnessed a shift in how companies operate and innovate. One of the key driving forces behind this transformation is the emergence of incubators and co-working spaces specifically tailored to meet the unique budget and schedule needs of startups.
Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

The answer is “Yes!” While January marks the official new year, many businesses view September as a fresh start. This makes summer an ideal time for commercial property owners to schedule long-term electrical maintenance projects.
The design-build advantage: Integrated interior design solutions - by Parker Snyder

The design-build advantage: Integrated interior design solutions - by Parker Snyder

When it comes to corporate interior spaces for both commercial and industrial projects, partnering with a design-build firm with in-house interior design services can offer clients many benefits. Unlike traditional delivery methods where interior designers operate independently from the design and construction teams, often creating a longer project timeline as cost negotiations and revisions ensue
Careers in Construction Month focus on training and safety - by Joe Camilo

Careers in Construction Month focus on training and safety - by Joe Camilo

October is Careers in Construction Month, and rarely has it been more consequential. According to our chapter’s national parent organization, the construction industry needs to attract half-a-million new workers in the coming year to meet demand. Addressing that need is a huge job, but we at ABC MA are trying to do our part.