Bufftree completes Phase I of Greek Orthodox Church project
September 15, 2009 - Construction Design & Engineering
Bufftree Building Company completed Phase I relocation of St. George Greek Orthodox Church and Hellenic Cultural Center from Ashley Blvd. to a 6-acre site on Cross Rd. across from the George H. Potter School.
This official opening of the 4,700 s/f, handicapped-accessible building contains a church with a seating capacity of 160, an attached function room for 60 persons and administrative offices.
Rescom Architectural, Inc. was the architect for the project.
Phase 2 of the project would convert this building into a function hall only and construct a more grand church to the south with a connecting link between the two.
"The Bufftree Building Co. has done an outstanding job for us," said George Bebis, chairman of the St. George Greek Orthodox Church building committee. "At times it can be a challenge working with a nonprofit organization. Bufftree has always met that challenge and exceeded it with responsive, patient and professional service. Everyone at St. George Greek Orthodox Church is highly impressed with their extraordinary staff."