News: Construction Design & Engineering

Project of the Month: Maugel Architects and Dellbrook|JKS complete 55,000 s/f clubhouse renovation at Nashawtuc Country Club

Concord, MA Maugel Architects and Dellbrook|JKS have completed the 55,000 s/f clubhouse renovation and expansion at Nashawtuc Country Club. The new facility provides a modern farmhouse-style clubhouse designed with clean lines, contrasting materials, and human-scale proportions featuring expanded wellness, fitness, dining amenities, and event spaces.

Strategic planning for the project began in 2014 when Maugel Architects led discussions with club leadership to explore options to improve their members’ experience. Although well-loved, the existing clubhouse had aging building systems and limited space for growth. A multi-year planning effort was undertaken to establish priorities and determine a budget for the project. After a thorough analysis and an extensive consensus-building campaign, a renovation and expansion of the facility was undertaken.

 

 

The 15-month construction project was led by Dellbrook|JKS and supported by TFMoran, Inc., Meisner Brem Corp., AHA Engineers, Colburn & Guyette, Lemon Brook, LLC, CSL Consulting, and Creative Office Pavilion. Nine months into the construction schedule COVID-19 hit. The Dellbrook|JKS team worked closely with town officials to keep the project moving forward, and although faced with supply and material delays, the team strategically navigated the challenges to a successful project completion.

 

 

Top design goals for the project included improving circulation throughout the clubhouse, creating a better separation between public and member-only areas, streamlining access to food service, and creating an advanced health and fitness center. The existing clubhouse was difficult to navigate due to numerous prior additions and renovations. Special attention was given to improving clubhouse circulation by creating clear and distinct paths for visitors and members. Public and private event spaces were strategically arranged to connect to essential food service areas, while providing privacy for member-only areas. Through materiality and scale, spaces now flow seamlessly throughout the clubhouse, enhancing the member experience and reflecting the sophistication of the Nashawtuc Country Club brand.

Prior to the renovation, food service supplies and preparation areas were located on separate levels, and it was not uncommon to see staff in the member elevator carrying food trays or running down the stairs to get food from the cooler. The new design has a large centrally-located kitchen with two full cooking lines–one to serve ballroom events and another for restaurant service. Dining areas were also placed on the same level, increasing staff efficiency and improving the member experience.

New fitness and exercise areas feature a 3,500 s/f fitness center equipped with the latest pneumatic equipment and a 1,000 s/f fitness studio that hosts a variety of classes, including yoga and kickboxing. Expanded and renovated locker rooms were also added to serve the club’s growing membership.

The project team included: 

  • Maugel Architects - Architect
  • CSL Consulting - Owners Project Manager
  • TFMoran - Structural Engineer
  • Precision Fitness - Fitness Equipment
  • Dellbrook|JKS - Construction Manager
MORE FROM Construction Design & Engineering
Construction Design & Engineering

Weston & Sampson earns award from ACEC for Arlington DPW job

Arlington, MA Weston & Sampson Engineers, Inc., has earned a National Recognition Award for exemplary engineering achievement in the American Council of Engineering Companies’ (ACEC) 58th annual Engineering Excellence Awards (EEA). The award comes for leading the renovation of the Arlington Department of Public Works (DPW) facility.
READ ON THE GO
DIGITAL EDITIONS
Subscribe
Columns and Thought Leadership
State legislature ends session without passing PLA bill - by Joe Camilo

State legislature ends session without passing PLA bill - by Joe Camilo

Massachusetts taxpayers dodged a bullet when the state Senate didn’t take up legislation passed by the House in the waning moments of the legislative session that would have made it easier for municipalities and state agencies to use union-only project labor agreements (PLAs) on construction projects.
Ask the Electrician:  How do I prepare my commercial building for a disaster?

Ask the Electrician: How do I prepare my commercial building for a disaster?

New England’s notorious weather – from fierce winter storms to summer squalls and fall hurricanes – can leave businesses in the dark. While power outages are often blamed on storms, they can also be caused by unforeseen events like accidents or construction mishaps. While it’s impossible to prevent disasters and power outages entirely, proactive preparation can significantly minimize their impact on your commercial building.
Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

The answer is “Yes!” While January marks the official new year, many businesses view September as a fresh start. This makes summer an ideal time for commercial property owners to schedule long-term electrical maintenance projects.
The design-build advantage: Integrated interior design solutions - by Parker Snyder

The design-build advantage: Integrated interior design solutions - by Parker Snyder

When it comes to corporate interior spaces for both commercial and industrial projects, partnering with a design-build firm with in-house interior design services can offer clients many benefits. Unlike traditional delivery methods where interior designers operate independently from the design and construction teams, often creating a longer project timeline as cost negotiations and revisions ensue