News: Spotlights

Project of the Month: JM Coull completes design-build construction of Primetals Technologies’ new manufacturing facility

South Sutton, MA JM Coull (JMC) has completed the design-build construction of Primetals Technologies’ new 183,000 s/f, $30 million manufacturing and office facility. 

The building is a modern and spacious facility that houses the company’s manufacturing, engineering, and sales operations. A joint venture between Mistubishi Heavy Industries and partners, Primetals Technologies is a leader in metallurgical plant solutions.

JMC’s design-build team included studio TROIKA as architect, Andrews Survey & Engineering as civil engineer, RRC Engineering as structural engineer, and design-build subcontractors Hampshire Fire Protection, Garabedian Plumbing & Heating, Tech Mechanical (HVAC), and Interstate Electrical Services.  

The project was completed by JMC in just over one year from breaking ground, including pandemic-related disruptions near the end. Scannell Properties (Indianapolis, Indiana) developed the project on behalf of Primetals Technologies.

“Our StartSmart Preconstruction Program played a pivotal role in shaping the direction of this project,” said JMC president Andy Coull. “Originally envisioned as a renovation of Primetals Technologies’ existing Worcester facility, it was determined during the preconstruction process that the company would be better served from an efficiency and operating cost standpoint by relocating to a new facility.” 

The building’s shell was constructed of insulated precast concrete panels. A 143,000 s/f high-bay open manufacturing factory comprises the majority of the new facility. The factory features 50-foot x 50-foot column spacing and an 8-inch-thick, double-reinforced concrete slab and was designed to provide Primetals Technologies with ample room for expanding its innovative technologies in cutting-edge, custom-tailored plant equipment and services for metal producers. 

Additionally, the facility includes a 40,000 s/f, two-story office building. The space fosters close collaboration between engineering and manufacturing functions, which had previously been located in separate facilities in Worcester. 

The project is located on a 16-acre site and required an extensive sitework package to create a level, at-grade earthen foundation on which to build. Much of the existing soil was unsuitable for reuse. Items that had once been buried on site, including truck parts and telephone poles, were discovered during excavation and had to be disposed of before suitable fill could be brought on site. In total, 60,000 yards of new material was used to establish the site. A 22-foot-high engineered retaining wall was also constructed.

The project team included the following: 

  • JM Coull - Design-Builder
  • Hampshire Fire Protection Co., LLC - Fire Protection
  • Garabedian Plumbing & Heating, Inc. - Plumbing & Heating
  • Tech Mechanical - HVAC
  • Interstate Electrical Services - Electrical
READ ON THE GO
DIGITAL EDITIONS
Subscribe
STAY INFORMED FOR $9.99/Mo.
NEREJ PRINT EDITION
Stay Informed
STAY CONNECTED
SIGN-UP FOR NEREJ EMAILS
Newsletter
Columns and Thought Leadership
Shawmut Design and Construction breaks ground on the 195 District Park Pavilion in Providence, RI

Shawmut Design and Construction breaks ground on the 195 District Park Pavilion in Providence, RI

Providence, RI Shawmut Design and Construction celebrated the ceremonial groundbreaking for the 195 District Park Pavilion, marking the start of construction on a facility that will feature year-round dining and support space for park operations. In addition to the 3,500 s/f building, the project will include infrastructure upgrades
The New England Real Estate Journal presents<br> the First Annual Project of the Year Award! Vote today!

The New England Real Estate Journal presents
the First Annual Project of the Year Award! Vote today!

The New England Real Estate proud to showcase the remarkable projects that have graced the cover and center spread of NEREJ this year, all made possible by the collaboration of outstanding project teams. Now, it's time to recognize the top project of 2024, and we need your vote!
Investing in a falling rate environment - by Harrison Klein

Investing in a falling rate environment - by Harrison Klein

Long-term interest rates have fallen by 100 basis points, and the market is normalizing. In December of 2022 I wrote an article about investing in a high interest rate, high inflation market. Since then, inflation has cooled off, and the Fed has begun lowering their funds rate.
The 2024 CRE markets: “The Ups” (industrial) and “The Downs” (Boston class B/C office) - by Webster Collins

The 2024 CRE markets: “The Ups” (industrial) and “The Downs” (Boston class B/C office) - by Webster Collins

The industrial markets have never been stronger. What has happened is that the build out of Devens with new high-tech biotech manufacturing with housing to service these buildings serves as the connector required to really make the I-495 West market sizzle. Worcester has been the beneficiary