News: Construction Design & Engineering

Project of the Month: Maugel Architects and J. Calnan & Assocs. complete Olympus Scientific Solutions 122,000 s/f restack

breakroom

 

cafeteria

 

Waltham, MA Maugel Architects and J. Calnan & Associates (JC&A) completed the 122,000 s/f restack of the Olympus office and manufacturing facility which houses their Scientific Solutions business. Olympus Scientific Solutions is a world-leading manufacturer of innovative non-destructive testing instruments used in industrial and research applications ranging from aerospace, power generation, petrochemical, civil infrastructure, automotive and consumer products.  

The Maugel-JC&A team had previously designed Olympus’ original interior fit-out in 2011. The 2019 project entailed a nine-phase renovation of expansion and occupied space encompassing 12 departments and over 500 employees. STV|DPM served as project OPM with MEP/FP engineering services provided by WB Engineers and Consultants.

The master plan and interior design, led by Maugel Architects, optimized efficiencies across office areas to maintain proper adjacencies to manufacturing and lab spaces and enabled the consolidation of Olympus’ Newton facility into the Waltham location.  New amenity and collaboration areas were strategically located throughout the facility to foster productivity and social connection across departments.  

collaboration space

 

demonstration lab

 

The use of graphic wall coverings, bold textured accent walls, and dramatic mid-tone wood accents create a fresh contemporary space that reflects the branding of the industry leading firm. The creative use of LED lighting of varying styles add interest to the space. Soft flooring was used in differing patterns to delineate workspaces and enhance acoustics and aesthetics. Other spaces include 28 new conference rooms, gym and locker rooms, a film studio and demo area, and an enlarged redesigned kitchen and breakroom.

“The Olympus project illustrates the best in modern workspace design. We have enjoyed a long-standing relationship with Olympus OSSA and J. Calnan & Associates and were honored to be selected to design the master plan and interior design for the Olympus restack,” said Heather Merwin, Olympus project interior director for Maugel Architects.  “The Olympus team, led by Joe Welch and Jason Shapiro, had a clear vision and worked closely with the design team to ensure the new space would not only function well, but provide a creative work environment rich in amenity hubs and collaboration areas that fostered productivity and employee well-being.”

Project team: J. Calnan & Associates, Maugel Architects, LC Anderson HVAC, Devine Technology, WB Engineers + Consultants, and Superior Contracting Services.

kitchen

 

reception area

 

 

MORE FROM Construction Design & Engineering
Construction Design & Engineering

Weston & Sampson earns award from ACEC for Arlington DPW job

Arlington, MA Weston & Sampson Engineers, Inc., has earned a National Recognition Award for exemplary engineering achievement in the American Council of Engineering Companies’ (ACEC) 58th annual Engineering Excellence Awards (EEA). The award comes for leading the renovation of the Arlington Department of Public Works (DPW) facility.
READ ON THE GO
DIGITAL EDITIONS
Subscribe
Columns and Thought Leadership
State legislature ends session without passing PLA bill - by Joe Camilo

State legislature ends session without passing PLA bill - by Joe Camilo

Massachusetts taxpayers dodged a bullet when the state Senate didn’t take up legislation passed by the House in the waning moments of the legislative session that would have made it easier for municipalities and state agencies to use union-only project labor agreements (PLAs) on construction projects.
The design-build advantage: Integrated interior design solutions - by Parker Snyder

The design-build advantage: Integrated interior design solutions - by Parker Snyder

When it comes to corporate interior spaces for both commercial and industrial projects, partnering with a design-build firm with in-house interior design services can offer clients many benefits. Unlike traditional delivery methods where interior designers operate independently from the design and construction teams, often creating a longer project timeline as cost negotiations and revisions ensue
Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

The answer is “Yes!” While January marks the official new year, many businesses view September as a fresh start. This makes summer an ideal time for commercial property owners to schedule long-term electrical maintenance projects.
Ask the Electrician:  How do I prepare my commercial building for a disaster?

Ask the Electrician: How do I prepare my commercial building for a disaster?

New England’s notorious weather – from fierce winter storms to summer squalls and fall hurricanes – can leave businesses in the dark. While power outages are often blamed on storms, they can also be caused by unforeseen events like accidents or construction mishaps. While it’s impossible to prevent disasters and power outages entirely, proactive preparation can significantly minimize their impact on your commercial building.