News: Construction Design & Engineering

Margulies Perruzzi Architects completes Boston Anaytical lab

Salem, NH Margulies Perruzzi Architects (MPA) completed a new 30,000 s/f laboratory and office facility for Boston Analytical, the life sciences division of Alpha Analytical.  Boston Analytical’s new and expanded space houses high-tech chemistry and microbiology laboratories equipped with the most sophisticated and up-to-date analytical testing equipment.

Seeking to consolidate and expand its operations, Boston Analytical, a premier current Good Manufacturing Practice (cGMP) compliant laboratory, engaged MPA to program and design the spaces in its new facility. Most of the newly outfitted space is production space for testing, including 20,000 s/f of chemistry, stability, and microbial labs and 2,000 s/f of ISO 8 to ISO 5 clean rooms. This expanded space with cutting-edge equipment has increased lab capacity by 55 percent and stability storage by 130%, with eight new chambers including a large capacity walk-in chamber. Additional space in the facility supports office and administrative functions, including reception, open and closed offices and conference rooms, and a kitchen/dining area.

“Boston Analytical is committed to providing the highest quality analytical testing services to companies and organizations in the pharmaceutical industry. With this mission, MPA understood that our new space needed to accommodate an escalating demand for our services,” said James Mich, general manager at Boston Analytical. “Our new ultramodern space has improved employee satisfaction by providing the latest in pharmaceutical testing technology in a new and attractive place to work. MPA’s lab design will allow us to successfully meet the needs of our increasing pharmaceutical client base.”

Built by Bowdoin Construction, interior features include new lab casework, fume hoods, epoxy floors, and a new energy efficient HVAC system with a high efficiency boiler plant. MPA coordinated closely with contractors to provide appropriate space for the specialized mechanical and support systems required to maintain the strict airborne particulate and cleanliness standards. Those systems include high-efficiency particulate air (HEPA), wastewater treatment, and reverse osmosis and deionization (RO/DI) systems. Adherence to the design/build schedule was key: Boston Analytical had to carefully move on a phased basis, concluding work in the existing space and then moving to the new space after it was validated and certified for production.

 Boston Analytical provides a variety of the highest quality analytical testing services to support CMC for Drug Development and Release Testing, including complete Stability Testing, Analytical Development Testing, and Microbiology Testing.

MORE FROM Construction Design & Engineering
Construction Design & Engineering

Weston & Sampson earns award from ACEC for Arlington DPW job

Arlington, MA Weston & Sampson Engineers, Inc., has earned a National Recognition Award for exemplary engineering achievement in the American Council of Engineering Companies’ (ACEC) 58th annual Engineering Excellence Awards (EEA). The award comes for leading the renovation of the Arlington Department of Public Works (DPW) facility.
READ ON THE GO
DIGITAL EDITIONS
Subscribe
Columns and Thought Leadership
The design-build advantage: Integrated interior design solutions - by Parker Snyder

The design-build advantage: Integrated interior design solutions - by Parker Snyder

When it comes to corporate interior spaces for both commercial and industrial projects, partnering with a design-build firm with in-house interior design services can offer clients many benefits. Unlike traditional delivery methods where interior designers operate independently from the design and construction teams, often creating a longer project timeline as cost negotiations and revisions ensue
State legislature ends session without passing PLA bill - by Joe Camilo

State legislature ends session without passing PLA bill - by Joe Camilo

Massachusetts taxpayers dodged a bullet when the state Senate didn’t take up legislation passed by the House in the waning moments of the legislative session that would have made it easier for municipalities and state agencies to use union-only project labor agreements (PLAs) on construction projects.
Ask the Electrician:  How do I prepare my commercial building for a disaster?

Ask the Electrician: How do I prepare my commercial building for a disaster?

New England’s notorious weather – from fierce winter storms to summer squalls and fall hurricanes – can leave businesses in the dark. While power outages are often blamed on storms, they can also be caused by unforeseen events like accidents or construction mishaps. While it’s impossible to prevent disasters and power outages entirely, proactive preparation can significantly minimize their impact on your commercial building.
Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

The answer is “Yes!” While January marks the official new year, many businesses view September as a fresh start. This makes summer an ideal time for commercial property owners to schedule long-term electrical maintenance projects.