News: Construction Design & Engineering

Laser scanning historic assets - Coburn Hall renovation, UMass Lowell - by Laureen Poulakis

 

 

 

 

Laureen Poulakis
Brennan Consulting

 

 

How do we speed up historic renovations?  The Northeast is a history buff’s playground and heritage buildings are everywhere, so how do we make them sustainable; how do we renovate and still be cost-effective?  Often at the heart of communities, historic buildings are no longer being overlooked; they are finding new life consistent with adaptive reuse trends. Area universities are also exploring ways to reprogram their historic assets as space becomes a premium. 

Brennan Consulting completed laser scanning at Coburn Hall, University of Mass. Lowell. Coburn was the first building to open the campus and originally served as a state teaching college in 1897. Four stories and 64,000 s/f of masonry and timber, this classical revival is slated for renovations. Coburn Hall is on the State Register of Historic Places, creating an even bigger challenge due to potential MEPA triggers and other regulatory constraints. 

The $45 million renovation plans for Coburn Hall include historic preservation and rehab, structural reinforcement, code compliance and modernization with a 14,000 s/f addition. CBT Architects and Suffolk Construction are leading the efforts. According to the RFP, ‘Preservation is important for this signature building and appropriate standards and practices should be employed to protect and celebrate the architectural character of the building…’ 

Brennan surveyors recently completed laser scanning of the entire building, exterior and interior. Detailed BIM models captured intricate moulding, stairwells, stained glass windows, chimneys and their interior stacks, murals, etched carvings and existing MEP. Laser scanning and BIM technologies can significantly reduce costs to the owner. Brennan’s data collection is being used in the Coburn Hall renovation to:

• Streamline design team coordination. 

• Assist in comprehensive structural analysis. 

• Inventory and protect historic assets. 

• Upgrade energy efficiency. 

• Perform preconstruction coordination.

Laser surveys also provide a hands-off inventory of historic art and architecture. Coburn’s gems are no exception. According to UMass, ‘the series of 10 plaster casts of men on horses and a singing choir, were made more than a century ago, from the frieze at the Parthenon, and then installed in Coburn around 1911. The lobby murals of mill girls at work and at leisure are the only visible examples of a set of 1934 murals painted by Works Progress Administration artists during the Great Depression. A matching mural that runs the length of the ballroom will be restored after being painted over decades ago.

Brennan’s experience in laser scanning continues to aid in minimizing client risk. The Coburn Hall project illustrates the effectiveness of BIM at reducing unnecessary capital costs during design and construction. Brennan Consulting, Inc. is recently WBE Certified and prequalified by Mass DOT.

Laureen Poulakis is a principal with Brennan Consulting, Inc., Burlington, Mass. 

MORE FROM Construction Design & Engineering
Construction Design & Engineering

Weston & Sampson earns award from ACEC for Arlington DPW job

Arlington, MA Weston & Sampson Engineers, Inc., has earned a National Recognition Award for exemplary engineering achievement in the American Council of Engineering Companies’ (ACEC) 58th annual Engineering Excellence Awards (EEA). The award comes for leading the renovation of the Arlington Department of Public Works (DPW) facility.
READ ON THE GO
DIGITAL EDITIONS
Subscribe
Columns and Thought Leadership
Ask the Electrician:  How do I prepare my commercial building for a disaster?

Ask the Electrician: How do I prepare my commercial building for a disaster?

New England’s notorious weather – from fierce winter storms to summer squalls and fall hurricanes – can leave businesses in the dark. While power outages are often blamed on storms, they can also be caused by unforeseen events like accidents or construction mishaps. While it’s impossible to prevent disasters and power outages entirely, proactive preparation can significantly minimize their impact on your commercial building.
State legislature ends session without passing PLA bill - by Joe Camilo

State legislature ends session without passing PLA bill - by Joe Camilo

Massachusetts taxpayers dodged a bullet when the state Senate didn’t take up legislation passed by the House in the waning moments of the legislative session that would have made it easier for municipalities and state agencies to use union-only project labor agreements (PLAs) on construction projects.
Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

The answer is “Yes!” While January marks the official new year, many businesses view September as a fresh start. This makes summer an ideal time for commercial property owners to schedule long-term electrical maintenance projects.
The design-build advantage: Integrated interior design solutions - by Parker Snyder

The design-build advantage: Integrated interior design solutions - by Parker Snyder

When it comes to corporate interior spaces for both commercial and industrial projects, partnering with a design-build firm with in-house interior design services can offer clients many benefits. Unlike traditional delivery methods where interior designers operate independently from the design and construction teams, often creating a longer project timeline as cost negotiations and revisions ensue