News: Construction Design & Engineering

J&M Brown Co. underway with electrical construction at 345 Harrison Ave.

345 Harrison Avenue - Boston, Mass. 345 Harrison Avenue - Boston, MA

Boston, MA J&M Brown Company is underway with comprehensive electrical construction of 345 Harrison Ave., the new 585-unit luxury residential/multi-use complex in in the South End. The development is comprised of two 14-story buildings, housing 535,900 s/f of residential space and 33,550 s/f of ground floor retail and restaurant space. JMB’s scope entails installation of the complete electrical distribution system, LED lighting, fire alarm system and tel/data systems.  The tel/data system installations are being provided by J&M Brown’s low voltage division, Spectrum Integrated Technologies. The project team includes CBT Architects, John Moriarty & Assoc., UDR and RW Sullivan Engineering.

The 345 Harrison Ave. complex, developed by Boston based UDR, will have a phased occupancy with the first phase opening scheduled for January 2018.  The aggressive schedule requires that all electrical systems, primary and emergency power systems and complete fire alarm installation to be fully functioning at that time. The total project has targeted completion for the summer 2018, and all major electrical systems will be completed months in advance.

To streamline the construction process in the tightly scheduled project, JMB is utilizing the Trimble MEP layout solution platform. JMB’s CAD coordinator Kelly Flynn and general foreman Wayne Lucas, have planned electrical conduit layouts and installation areas using with 3D positional data system, enabling the JMB field crew to handle installation with exacting precision and maximum efficiency.  Also enhancing the project’s consistent workflow, in the pre-construction phase, general foreman Phil Talbot has designed layouts, and pre-planned material and labor requirements for the development’s apartment units.

J&M Brown project managers Patrick O’Neil and Kimberley Estabrooks are managing the project with a field crew expected to range upwards of 40 to 50 IBEW Local 103 electricians at peak construction.

345 Harrison Ave.’s amenities include a four-level parking garage with a green roof, 13th floor Sky Lounge, resort-style pool and fitness center. 

The 345 Harrison Ave. project is across the street from the Ink Block, and the MBTA Red Line, Orange and Silver Lines are all within walking distance.

MORE FROM Construction Design & Engineering
Construction Design & Engineering

Weston & Sampson earns award from ACEC for Arlington DPW job

Arlington, MA Weston & Sampson Engineers, Inc., has earned a National Recognition Award for exemplary engineering achievement in the American Council of Engineering Companies’ (ACEC) 58th annual Engineering Excellence Awards (EEA). The award comes for leading the renovation of the Arlington Department of Public Works (DPW) facility.
READ ON THE GO
DIGITAL EDITIONS
Subscribe
Columns and Thought Leadership
The design-build advantage: Integrated interior design solutions - by Parker Snyder

The design-build advantage: Integrated interior design solutions - by Parker Snyder

When it comes to corporate interior spaces for both commercial and industrial projects, partnering with a design-build firm with in-house interior design services can offer clients many benefits. Unlike traditional delivery methods where interior designers operate independently from the design and construction teams, often creating a longer project timeline as cost negotiations and revisions ensue
Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

The answer is “Yes!” While January marks the official new year, many businesses view September as a fresh start. This makes summer an ideal time for commercial property owners to schedule long-term electrical maintenance projects.
State legislature ends session without passing PLA bill - by Joe Camilo

State legislature ends session without passing PLA bill - by Joe Camilo

Massachusetts taxpayers dodged a bullet when the state Senate didn’t take up legislation passed by the House in the waning moments of the legislative session that would have made it easier for municipalities and state agencies to use union-only project labor agreements (PLAs) on construction projects.
Ask the Electrician:  How do I prepare my commercial building for a disaster?

Ask the Electrician: How do I prepare my commercial building for a disaster?

New England’s notorious weather – from fierce winter storms to summer squalls and fall hurricanes – can leave businesses in the dark. While power outages are often blamed on storms, they can also be caused by unforeseen events like accidents or construction mishaps. While it’s impossible to prevent disasters and power outages entirely, proactive preparation can significantly minimize their impact on your commercial building.