News: Construction Design & Engineering

Highlighted projects by Pilgrim Interiors

Fitchburg Municipal Airport Fitchburg Municipal Airport

Fitchburg Municipal Airport: The new $4.3 million, 4,100 s/f terminal and administration building on Crawford St. at the Fitchburg Municipal Airport. Pilgrim Interiors was responsible for the exterior framing and sheathing of the building shell, as well as interior partitions, drywall, doors, frames, and ceilings.

Soldier On - Housing for Veterans Soldier On - Housing for Veterans

Soldier On: a private non-profit organization committed to ending veteran homelessness, is renovating the former Western Mass Regional Police Academy in Agawam,  providing a housing community to the men and women it serves. This $14 million project will provide over 50,000 s/f of living space in the form of 51 new units of housing, as well as dining facilities, and administrative offices. Pilgrim Interiors, who will be responsible for the build out of all interior walls, including drywall and finishes, is extremely proud to be part of a project that provides such a crucial community based opportunity for those men and women who make incredible sacrifices for the good of all American citizens.

American Airlines Credit Union at Logan Airport, Boston American Airlines Credit Union at Logan Airport, Boston

Boston Logan Airport: The new American Airlines Credit Union at Boston’s Logan Airport. This fit-out was completed on an accelerated schedule; the challenge of working in crowded public spaces is met by adopting flexible schedules, longer shifts, and timely material deliveries.

Red Clover Common - Brattleboro, VT Red Clover Common - Brattleboro, VT

Red Clover Commons: A 55 unit residential complex, this $12 million, 80,000 s/f building, is currently being built out at a furious pace. Pilgrim Interior’s presence is substantial, routinely 20 or more men daily, working on the installation of nearly 10,000 sheets of drywall, several miles (literally) of resilient channel, and acres of acoustical ceilings.

Amherst College - Garmen House, Amherst, MA Amherst College - Garmen House, Amherst, MA

Amherst College – Garmen House: This beautiful circular staircase in an Amherst College dormitory house demonstrates the high level of quality that Pilgrim Interiors brings to challenging, non-conventional construction projects.

Hampton Inn Westborough Hampton Inn Westborough

Hampton Inn Westborough: The skeletal framing of this 60,000 s/f hotel beautifully demonstrates the high quality and expertise Pilgrim Interiors brings to all of their projects. The complexity of the roof overhang is easily managed by the highly skilled leaders and craftsman that make up the core of Pilgrim Interiors.

To read more about Pilgrim Interiors click here.
MORE FROM Construction Design & Engineering
Construction Design & Engineering

Weston & Sampson earns award from ACEC for Arlington DPW job

Arlington, MA Weston & Sampson Engineers, Inc., has earned a National Recognition Award for exemplary engineering achievement in the American Council of Engineering Companies’ (ACEC) 58th annual Engineering Excellence Awards (EEA). The award comes for leading the renovation of the Arlington Department of Public Works (DPW) facility.
READ ON THE GO
DIGITAL EDITIONS
Subscribe
Columns and Thought Leadership
Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

The answer is “Yes!” While January marks the official new year, many businesses view September as a fresh start. This makes summer an ideal time for commercial property owners to schedule long-term electrical maintenance projects.
The design-build advantage: Integrated interior design solutions - by Parker Snyder

The design-build advantage: Integrated interior design solutions - by Parker Snyder

When it comes to corporate interior spaces for both commercial and industrial projects, partnering with a design-build firm with in-house interior design services can offer clients many benefits. Unlike traditional delivery methods where interior designers operate independently from the design and construction teams, often creating a longer project timeline as cost negotiations and revisions ensue
State legislature ends session without passing PLA bill - by Joe Camilo

State legislature ends session without passing PLA bill - by Joe Camilo

Massachusetts taxpayers dodged a bullet when the state Senate didn’t take up legislation passed by the House in the waning moments of the legislative session that would have made it easier for municipalities and state agencies to use union-only project labor agreements (PLAs) on construction projects.
Ask the Electrician:  How do I prepare my commercial building for a disaster?

Ask the Electrician: How do I prepare my commercial building for a disaster?

New England’s notorious weather – from fierce winter storms to summer squalls and fall hurricanes – can leave businesses in the dark. While power outages are often blamed on storms, they can also be caused by unforeseen events like accidents or construction mishaps. While it’s impossible to prevent disasters and power outages entirely, proactive preparation can significantly minimize their impact on your commercial building.