News: Construction Design & Engineering

Gorman Richardson Lewis Architects
handles two renovation projects

Waltham, MA Gorman Richardson Lewis Architects (GRLA) was selected by Mercy BioAnalytics Inc. (Mercy) to renovate its new 14,000 s/f office and laboratory space. Since 2018, Mercy has been dedicated to saving lives through detecting early-stage cancer, when therapy has the best opportunity for clinical impact.

GRLA designed modifications to the existing office and lab space which involved creating two separate lab spaces to accommodate their research, testing and development processes. The team also reconfigured the mechanical systems to meet stringent requirements. To create a space that reflects the Mercy brand, GRLA designed a 3D textured panel with the company logo for the lobby feature wall. New color schemes were introduced as well as vinyl film graphics in the conference room and collaboration areas. To ensure a seamless and successful project GRLA worked closely with the contractor, J. Calnan & Associates. GRLA is proud of the finished product that provides a space where Mercy can continue to grow and achieve its mission of saving lives.

GRLA also completed the renovations at the Christa McAuliffe Challenger Center for Integrated Science Learning at Framingham State University. GRLA worked closely with the Massachusetts State College Building Authority, STV, Inc., Commodore Builders, and Fitzemeyer & Tocci Associates to complete this project. The McAuliffe Center at FSU was originally built in 1994 and has been renovated to integrate the newest technologies and systems that represent the latest in Challenger Learning Centers nationwide.

The goal of the project was to convert the current center, used by students in grades K-12, into a suite of multifunctional, technology-enabled learning spaces, and to introduce modern visualizations and simulation capabilities. The lobby, Mission Control, Spacecraft, and Planetarium underwent a full redesign, along with support spaces like administration offices and restrooms. The lobby space was enhanced to accommodate large gatherings and create a seamless transition to the Challenger Command Center. The Command Center and the Spacecraft Experience were completely redesigned and equipped with new infrastructure. The planetarium was renovated to become a multifunctional space with moveable seats and equipped with state-of-the-art Projection Systems allowing presentations to be live and interactive.

Interior finishes, graphics and design elements were coordinated to promote excitement and interest in space study.

MORE FROM Construction Design & Engineering
Construction Design & Engineering

Weston & Sampson earns award from ACEC for Arlington DPW job

Arlington, MA Weston & Sampson Engineers, Inc., has earned a National Recognition Award for exemplary engineering achievement in the American Council of Engineering Companies’ (ACEC) 58th annual Engineering Excellence Awards (EEA). The award comes for leading the renovation of the Arlington Department of Public Works (DPW) facility.
READ ON THE GO
DIGITAL EDITIONS
Subscribe
Columns and Thought Leadership
Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

The answer is “Yes!” While January marks the official new year, many businesses view September as a fresh start. This makes summer an ideal time for commercial property owners to schedule long-term electrical maintenance projects.
Ask the Electrician:  How do I prepare my commercial building for a disaster?

Ask the Electrician: How do I prepare my commercial building for a disaster?

New England’s notorious weather – from fierce winter storms to summer squalls and fall hurricanes – can leave businesses in the dark. While power outages are often blamed on storms, they can also be caused by unforeseen events like accidents or construction mishaps. While it’s impossible to prevent disasters and power outages entirely, proactive preparation can significantly minimize their impact on your commercial building.
State legislature ends session without passing PLA bill - by Joe Camilo

State legislature ends session without passing PLA bill - by Joe Camilo

Massachusetts taxpayers dodged a bullet when the state Senate didn’t take up legislation passed by the House in the waning moments of the legislative session that would have made it easier for municipalities and state agencies to use union-only project labor agreements (PLAs) on construction projects.
The design-build advantage: Integrated interior design solutions - by Parker Snyder

The design-build advantage: Integrated interior design solutions - by Parker Snyder

When it comes to corporate interior spaces for both commercial and industrial projects, partnering with a design-build firm with in-house interior design services can offer clients many benefits. Unlike traditional delivery methods where interior designers operate independently from the design and construction teams, often creating a longer project timeline as cost negotiations and revisions ensue