News: Green Buildings

FlowMark Pulse Power Electronic Water Treatment Systems eliminates hard rock calcite scale - by Dan Cook

Dan Cook

Hard rock calcite scale is a problem in many facilities throughout New England including Boston and Cambridge. Hard rock calcite scale forms on heat transfer surfaces and piping of numerous HVAC and process applications including:

FlowMark Pulse Power Electronic
Water Treatment Systems.

• Steam boilers;

• Hot water heaters;

• Mixing valves;

• Heat exchangers;

• Chillers;

• Cooling towers and evaporative condensers;

• Autoclaves;

• Humidifiers;

• Clean steam boilers;

• Process equipment;

• Pool heat exchangers;

• Extend life of RO membranes;

• Wastewater treatment plants (struvite scale) - FlowMark also improved water clarity in secondary treatment system;

• Water treatment plants - calcite scale on UV lights reducing bacteria control performance and equipment life; and

• Landfills (leachate scale) - drainage piping and methane gas de-watering pumps.

Heat exchanger elements heat transfer surfaces
clean of scale after 3 months with FlowMark System.

FlowMark Pulse Power Electronic Water Treatment Systems are a great solution to eliminate or significantly reduce hard rock scale in its many forms in all these applications. The FlowMark System installation is simple. The coils just wrap around the exterior of the pipe before the equipment (no cutting of pipe) and connect to a controller that imparts a pulse frequency into the water changing the way calcium in solution changes to a solid. The calcium precipitates on the particles in the water instead of plating as a hard rack scale on heat transfer surfaces and the pipes. 

Case Study – Dedham Health & Athletic Complex Steam Boilers
The following article discusses an application with SteamMaster electric steam boilers providing steam for steam rooms in the Dedham Health & Athletic Complex. 

The Problems
Calcite scale is a problem with clean steam systems especially on heat transfer surfaces such as steam boilers or heat exchangers. The calcite scale problems include: 

1) Fouling of equipment; 

2) Increased energy use;

3) Increased expenses related to heat exchanger replacement; and

4) Difficult and time consuming to remove often requiring a hammer drill.

The Solution
Conservation Solutions Corp. installed a FlowMark electronic resonance pulse power water treatment system on the water supply before two steam boilers. Boiler #1 had been cleaned and Boiler #2 had scale causing fouling. 

The FlowMark Pulse Power System changes the way calcium forms. Instead of creating a hard rock calcite scale, the calcium precipitates on the particles in the water to make a powder, which is either filtered out in a filtration system or flows through the system to the steam room. 

The FlowMark System also removes existing scale over time. Expansion and contraction occurs in the boiler causing cracks to form in the hard rock calcite scale. Under normal conditions, the calcite fills the cracks causing the calcite scale to build-up. Using the FlowMark System, these cracks are no longer re-filled with calcite scale and the exiting scale eventually falls off. The existing scale also becomes softer and easier to remove. Calcite scale is eventually eliminated from the heat transfer surfaces providing a long-term sustainable energy efficient solution preventing future calcite scale from forming.

Vince Dusio and Carl  Congdon from the Dedham Health & Athletic Complex were relieved they were able to brush out by hand most of the calcite scale that had fallen off the heat exchanger piping in the boiler. Congdon said, that he “used to need a hammer drill and chisels to get the scale off the coils. This is so much easier when the scale falls off the heat exchanger and the remaining scale is softer making it really easy to remove.” Going forward they expects no hard rock scale to form on the heat exchangers and much better operating steam boiler energy efficiency and longer steam boiler equipment life.

Results
• Energy savings;

• Eliminated existing hard rock calcite scale;

• Prevented new hard rock calcite scale from forming;

• Reduced cost to replace steam boiler parts & heat exchangers; and

• Significantly reduce maintenance time required to clean steam boilers.

Dan Cook is president of Conservation Solutions Corp., Acton, Mass

READ ON THE GO
DIGITAL EDITIONS
Subscribe
READ ON THE GO
DIGITAL EDITIONS
Subscribe
STAY INFORMED FOR $9.99/Mo.
NEREJ PRINT EDITION
Stay Informed
STAY CONNECTED
SIGN-UP FOR NEREJ EMAILS
Newsletter
Columns and Thought Leadership
Shawmut Design and Construction breaks ground on the 195 District Park Pavilion in Providence, RI

Shawmut Design and Construction breaks ground on the 195 District Park Pavilion in Providence, RI

Providence, RI Shawmut Design and Construction celebrated the ceremonial groundbreaking for the 195 District Park Pavilion, marking the start of construction on a facility that will feature year-round dining and support space for park operations. In addition to the 3,500 s/f building, the project will include infrastructure upgrades
The New England Real Estate Journal presents<br> the First Annual Project of the Year Award! Vote today!

The New England Real Estate Journal presents
the First Annual Project of the Year Award! Vote today!

The New England Real Estate proud to showcase the remarkable projects that have graced the cover and center spread of NEREJ this year, all made possible by the collaboration of outstanding project teams. Now, it's time to recognize the top project of 2024, and we need your vote!
Investing in a falling rate environment - by Harrison Klein

Investing in a falling rate environment - by Harrison Klein

Long-term interest rates have fallen by 100 basis points, and the market is normalizing. In December of 2022 I wrote an article about investing in a high interest rate, high inflation market. Since then, inflation has cooled off, and the Fed has begun lowering their funds rate.
The 2024 CRE markets: “The Ups” (industrial) and “The Downs” (Boston class B/C office) - by Webster Collins

The 2024 CRE markets: “The Ups” (industrial) and “The Downs” (Boston class B/C office) - by Webster Collins

The industrial markets have never been stronger. What has happened is that the build out of Devens with new high-tech biotech manufacturing with housing to service these buildings serves as the connector required to really make the I-495 West market sizzle. Worcester has been the beneficiary