News: Front Section

Erland Construction chosen by The Davis Cos. to build 3-story lab building with Jacobs

Cambridge, MA Erland Construction announced that The Davis Companies has selected the firm to construct 101 Smith Place–a 165,000 s/f cutting edge three-story lab-ready facility. 101 Smith Place will be part of The Davis Cos.’ growing life science campus referred to as The Quad. The Quad consists of four new and redeveloped life science/lab/R&D buildings including 75 Moulton St. which Erland completed for The Davis Cos. in 2017.

“We are excited to be partnering with The Davis Companies on this latest addition to The Quad,” said Steve Craft, corporate, commercial group manager, Erland. “This building will help sustain the future growth of the life science market in Cambridge and we’re thrilled to be a part of it.”

From start to finish, construction of the 3-story lab-ready facility with one level of below-grade parking and a mechanical penthouse on the roof will take 22 months to complete.

101 Smith Place is being designed and constructed as a core and shell building with preparations for future tenants.

The project is scheduled to complete in the Spring of 2023. “This is our third time working with The Davis Companies, and we’re excited to continue cultivating our partnership with this project,” said Ben McConchie, Project Executive, Erland. “Our team looks forward to bringing their vision for the building to life and getting it ready for future tenants.”

READ ON THE GO
DIGITAL EDITIONS
Subscribe
READ ON THE GO
DIGITAL EDITIONS
Subscribe
STAY INFORMED FOR $9.99/Mo.
NEREJ PRINT EDITION
Stay Informed
STAY CONNECTED
SIGN-UP FOR NEREJ EMAILS
Newsletter
Columns and Thought Leadership
Shawmut Design and Construction breaks ground on the 195 District Park Pavilion in Providence, RI

Shawmut Design and Construction breaks ground on the 195 District Park Pavilion in Providence, RI

Providence, RI Shawmut Design and Construction celebrated the ceremonial groundbreaking for the 195 District Park Pavilion, marking the start of construction on a facility that will feature year-round dining and support space for park operations. In addition to the 3,500 s/f building, the project will include infrastructure upgrades
The New England Real Estate Journal presents<br> the First Annual Project of the Year Award! Vote today!

The New England Real Estate Journal presents
the First Annual Project of the Year Award! Vote today!

The New England Real Estate proud to showcase the remarkable projects that have graced the cover and center spread of NEREJ this year, all made possible by the collaboration of outstanding project teams. Now, it's time to recognize the top project of 2024, and we need your vote!
Investing in a falling rate environment - by Harrison Klein

Investing in a falling rate environment - by Harrison Klein

Long-term interest rates have fallen by 100 basis points, and the market is normalizing. In December of 2022 I wrote an article about investing in a high interest rate, high inflation market. Since then, inflation has cooled off, and the Fed has begun lowering their funds rate.
The 2024 CRE markets: “The Ups” (industrial) and “The Downs” (Boston class B/C office) - by Webster Collins

The 2024 CRE markets: “The Ups” (industrial) and “The Downs” (Boston class B/C office) - by Webster Collins

The industrial markets have never been stronger. What has happened is that the build out of Devens with new high-tech biotech manufacturing with housing to service these buildings serves as the connector required to really make the I-495 West market sizzle. Worcester has been the beneficiary