News: Construction Design & Engineering

DJSA Architecture to design an 80,000 s/f addition for The Shearwater Companies

DJSA Stoughton.jpeg" width="500" />

Stoughton, MA DJSA Architecture PC was selected by commercial real estate investment and development firm The Shearwater Companies to design an 80,000 s/f addition to their property at 200 Shuman Ave.

Their property is currently 160,000 s/f in size. Jamie Ciffolillo, one of the owners at Shearwater, said that their defense contractor tenant came to them with a need for expanded space. Without an existing suitable property in town, Shearwater instead determined that an addition to the existing property might suit their tenant’s needs. The property contains sufficient acreage to accommodate such an addition, although there were some challenges on the site. Shearwater engaged the services of Dennis Swart and DJSA, to design an addition to the existing building. DJSA compiled an experienced team to assist with navigating the project through the entitlement process. High Point Engineering and Stoughton zoning attorney Barry Crimmins guided the project through town approvals.

“Dennis at DJSA was instrumental in putting together a strong development team, and also in being able to configure 80,000 s/f expansion on a space that was incredibly challenging,” Ciffolillo said. He noted that the site is inundated with ledge, and that the project was further complicated because of a 150 foot electrical easement that runs through the property.

DJSA then brought in Integrated Builders to assist The Shearwater Cos. with pre-construction and construction management. DJSA selected Quieto Consulting, Electrical Systems Engineering Inc and H + O Engineering to round out the design team.

The team was able to position the building expansion so that it would meet the tenant needs and deadlines, and not encroach on the easement. As a result, they were able to move through the permitting process. Site clearing is scheduled to begin this month, and Shearwater is looking at an April 2022 date for completion.

Swart, president of DJSA, said, “This has been an excellent project. The Shearwater Companies is a great company to work with – very entrepreneurial, and very tenant-focused. We are pleased they entrusted us and our design partners with finding this solution that fit their tenant needs. This is a great example of a team coming together to find a creative solution. A tenant needed additional space, and the solution allows them to stay where they are but have the expanded workspace they need, and the town of Stoughton gets to keep a great corporate citizen. We are grateful to Jamie Ciffolillo and his team for their confidence in us.”

 

MORE FROM Construction Design & Engineering
Construction Design & Engineering

Weston & Sampson earns award from ACEC for Arlington DPW job

Arlington, MA Weston & Sampson Engineers, Inc., has earned a National Recognition Award for exemplary engineering achievement in the American Council of Engineering Companies’ (ACEC) 58th annual Engineering Excellence Awards (EEA). The award comes for leading the renovation of the Arlington Department of Public Works (DPW) facility.
READ ON THE GO
DIGITAL EDITIONS
Subscribe
Columns and Thought Leadership
Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

The answer is “Yes!” While January marks the official new year, many businesses view September as a fresh start. This makes summer an ideal time for commercial property owners to schedule long-term electrical maintenance projects.
State legislature ends session without passing PLA bill - by Joe Camilo

State legislature ends session without passing PLA bill - by Joe Camilo

Massachusetts taxpayers dodged a bullet when the state Senate didn’t take up legislation passed by the House in the waning moments of the legislative session that would have made it easier for municipalities and state agencies to use union-only project labor agreements (PLAs) on construction projects.
The design-build advantage: Integrated interior design solutions - by Parker Snyder

The design-build advantage: Integrated interior design solutions - by Parker Snyder

When it comes to corporate interior spaces for both commercial and industrial projects, partnering with a design-build firm with in-house interior design services can offer clients many benefits. Unlike traditional delivery methods where interior designers operate independently from the design and construction teams, often creating a longer project timeline as cost negotiations and revisions ensue
Ask the Electrician:  How do I prepare my commercial building for a disaster?

Ask the Electrician: How do I prepare my commercial building for a disaster?

New England’s notorious weather – from fierce winter storms to summer squalls and fall hurricanes – can leave businesses in the dark. While power outages are often blamed on storms, they can also be caused by unforeseen events like accidents or construction mishaps. While it’s impossible to prevent disasters and power outages entirely, proactive preparation can significantly minimize their impact on your commercial building.