Ask the electrician: What goes into building planning before construction starts? - by Ed Gould

Ed Gould

Everyone is familiar with the role of an architect and how they help plan for a building prior to construction. In addition, there’s detailed planning conducted by contractors and the trades that happen on site prior to the first steel beams of a building going up. Here is some insight about what that looks like on a modern construction project from the perspective of an electrical contractor.

3D Modeling and Data Points: Today, most of this detailed planning and coordination happens digitally using technologically advanced tools and software like Revit. Interstate uses 3D modeling from the inception of a project for many electrical installations including conduit and panelboard placement, temporary power, lighting, and power prefabrication assemblies. This allows Interstate to construct a building in a virtual world, to accurately place all components and fixtures precisely where they need to be installed, and resolve any conflicts before the field installation team receives a single piece of equipment.

When Interstate arrives at a jobsite to start planning our part of the project as the electrical contractor, we map out hundreds of virtual Trimble points that will help Interstate construct the 3D model of the entire project. 

Coordination with Other Subcontractors: You may be familiar with the role of general contractors and subcontractors on a typical construction project. The arrangement follows a model typically where the property owner hires a general contractor to be the lead on a project. The general contractor then brings in subcontractors for the necessary trades such as electrical, plumbing, HVAC, etc. Each subcontractor has their own equipment and components to oversee – and all the trades are sharing wall, ceiling, and floor space. That’s where “clash detection” comes in. 

Clash detection allows us to build our 3D model and join it to the model of other disciplines such as the mechanical contractor, the structural engineer, fire protection, etc. This all goes into 3D modeling software that identifies clashes. In prior history, there was a manual clash detection process in the field a month or so before installation. Problems would potentially be uncovered but were typically much harder to resolve. Today, using top of the line scanning technology, Interstate can identify and confirm difficult coordination areas in new and older buildings to determine exact locations of structure or MEP items. In addition, when Interstate coordinates work to be done by all the trades with a computer model as compared to using 2D flat drawings, we can assist in identifying which trade will install their work first by area.

Prefabrication’s Role: Part of the reason why extensive pre-planning and measurement is so important for Interstate is that we prefabricate most of the components that get installed on jobsites. This is becoming more of a standard practice across the construction industry. Previously, a lot of electrical components like conduit, power panels, and light fixtures would be assembled on the jobsite, leaving some room for adjustments and adaptations. 

Now, in-house project coordinators and detailers work through every phase of a project, turning the 3D models and coordinated construction drawings into actionable plans for material assembly and just-in-time point of installation delivery of the finished ready-to-install electrical components & systems. Assembly and installation is much more efficient this way, but must be in line with initial planning and there is less room for error.

Ed Gould is production area manager at Interstate Electrical Services, North Billerica, Mass.

READ ON THE GO
DIGITAL EDITIONS
Subscribe
READ ON THE GO
DIGITAL EDITIONS
Subscribe
STAY INFORMED FOR $9.99/Mo.
NEREJ PRINT EDITION
Stay Informed
STAY CONNECTED
SIGN-UP FOR NEREJ EMAILS
Newsletter
Columns and Thought Leadership
Shawmut Design and Construction breaks ground on the 195 District Park Pavilion in Providence, RI

Shawmut Design and Construction breaks ground on the 195 District Park Pavilion in Providence, RI

Providence, RI Shawmut Design and Construction celebrated the ceremonial groundbreaking for the 195 District Park Pavilion, marking the start of construction on a facility that will feature year-round dining and support space for park operations. In addition to the 3,500 s/f building, the project will include infrastructure upgrades
The New England Real Estate Journal presents<br> the First Annual Project of the Year Award! Vote today!

The New England Real Estate Journal presents
the First Annual Project of the Year Award! Vote today!

The New England Real Estate proud to showcase the remarkable projects that have graced the cover and center spread of NEREJ this year, all made possible by the collaboration of outstanding project teams. Now, it's time to recognize the top project of 2024, and we need your vote!
Investing in a falling rate environment - by Harrison Klein

Investing in a falling rate environment - by Harrison Klein

Long-term interest rates have fallen by 100 basis points, and the market is normalizing. In December of 2022 I wrote an article about investing in a high interest rate, high inflation market. Since then, inflation has cooled off, and the Fed has begun lowering their funds rate.
The 2024 CRE markets: “The Ups” (industrial) and “The Downs” (Boston class B/C office) - by Webster Collins

The 2024 CRE markets: “The Ups” (industrial) and “The Downs” (Boston class B/C office) - by Webster Collins

The industrial markets have never been stronger. What has happened is that the build out of Devens with new high-tech biotech manufacturing with housing to service these buildings serves as the connector required to really make the I-495 West market sizzle. Worcester has been the beneficiary