News: Construction Design & Engineering

Arrowstreet redesigns 2,750 s/f space for the Freedom Trail Foundation’s Trail Players at 44 School St.

Boston, MA Arrowstreet Inc. provided interior and environmental design services to the Freedom Trail Foundation, which moved into a new 2,750 s/f suite on the second floor of 44 School St. Utilized for Foundation operations, the space includes staging for the Freedom Trail Players – 45 local historians and artists who portray 18th Century citizenry of Boston who lead visitors and residents on all Foundation-led Freedom Trail Walk Into History tours, conduct in-school education programs statewide, and act as Freedom Trail and City of Boston ambassadors.

To convey a sense of America’s Revolutionary history, Arrowstreet outfitted the space using Patriotic colors and decorative elements including a historic graphic map of 19th Century Boston with an overlay of the iconic Freedom Trail and a graphic wall with famous quotes from Revolutionary-era figures such as Benjamin Franklin and Abigail Adams. The suite includes a welcoming entry, library, administrative area, ample space for the storage and maintenance of over 100 historically-accurate authentic costumes and accessories worn by the Freedom Trail Players, a kitchenette and break/training room, as well as dedicated areas for laundry, sewing and storage.

“We often have 20 Freedom Trail Players in the office at the same time preparing to interpret the Freedom Trail and its over 250 years of history to the public and private groups of all sizes,” said Suzanne Taylor, Freedom Trail Foundation’s executive director. “Arrowstreet helped us create a dynamic and flexible space that serves many functions for the staff and Players and is equally comfortable for both our employees and visitors.”

The Foundation was founded in 1964 and its former office was located at 99 Chauncy Street. After two years of searching for an office that was both big enough and centrally located along the Freedom Trail, the non-profit identified 44 School Street with the help of commercial real estate brokerage Cushman & Wakefield. The office’s grand opening celebrated with a reception on September 26.

“Within their new office space, we wanted a space that fosters creative energy and encouraged workplace collaboration,” said Sallyann Thomas, Arrowstreet’s director of interior design. “We’ve achieved a home for the Foundation that is functional and, at the same time, celebrates New England’s rich history that the organization brings to life every day.”

MORE FROM Construction Design & Engineering
Construction Design & Engineering

Weston & Sampson earns award from ACEC for Arlington DPW job

Arlington, MA Weston & Sampson Engineers, Inc., has earned a National Recognition Award for exemplary engineering achievement in the American Council of Engineering Companies’ (ACEC) 58th annual Engineering Excellence Awards (EEA). The award comes for leading the renovation of the Arlington Department of Public Works (DPW) facility.
READ ON THE GO
DIGITAL EDITIONS
Subscribe
Columns and Thought Leadership
The design-build advantage: Integrated interior design solutions - by Parker Snyder

The design-build advantage: Integrated interior design solutions - by Parker Snyder

When it comes to corporate interior spaces for both commercial and industrial projects, partnering with a design-build firm with in-house interior design services can offer clients many benefits. Unlike traditional delivery methods where interior designers operate independently from the design and construction teams, often creating a longer project timeline as cost negotiations and revisions ensue
State legislature ends session without passing PLA bill - by Joe Camilo

State legislature ends session without passing PLA bill - by Joe Camilo

Massachusetts taxpayers dodged a bullet when the state Senate didn’t take up legislation passed by the House in the waning moments of the legislative session that would have made it easier for municipalities and state agencies to use union-only project labor agreements (PLAs) on construction projects.
Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

The answer is “Yes!” While January marks the official new year, many businesses view September as a fresh start. This makes summer an ideal time for commercial property owners to schedule long-term electrical maintenance projects.
Ask the Electrician:  How do I prepare my commercial building for a disaster?

Ask the Electrician: How do I prepare my commercial building for a disaster?

New England’s notorious weather – from fierce winter storms to summer squalls and fall hurricanes – can leave businesses in the dark. While power outages are often blamed on storms, they can also be caused by unforeseen events like accidents or construction mishaps. While it’s impossible to prevent disasters and power outages entirely, proactive preparation can significantly minimize their impact on your commercial building.