News: Construction Design & Engineering

Acentech provides consulting/design services on two UConn buildings

Storrs, CT Acentech is providing a variety of consulting and design services for two University of Connecticut academic buildings: the Edward V. Gant Science Complex in Storrs and the UConn Health Academic Building in Farmington. 

UConn Edward V. Gant Science Complex - Storrs, Conn. UConn Edward V. Gant Science Complex - Storrs, CT

University of Connecticut Gant Science Complex, Storrs, Conn. Prioritizing new STEM facilities within the University of Connecticut system, the university is executing on a 20-year master plan to meet the goals of the state’s Next Generation Connecticut high technology investment program. The renovation of the Edward V. Gant Science Complex on the Storrs campus will address the building’s physical deterioration, update research and teaching facilities, and meet current STEM program requirements. The completed multi-phase renovation will be the first update to the 290,000 s/f structure since the 1970s.

Still in preliminary design stages, the Gant building renovation will include teaching labs, seminar rooms, research labs, lecture halls and active-learning style classrooms, all unified by an expansive atrium. In partnership with architecture firms Goody Clancy and Mitchell | Giurgola Architects, Acentech is providing acoustics, vibration, and audiovisual system design consulting for the entire building during each scheduled phase of the project. As a vibration-sensitive facility, mechanical system noise control and footfall vibration thresholds will be designed to ensure research integrity during the construction phases. Each section of this sprawling facility will feature modern digital media components, including high-definition presentation, user-friendly lecture capture and streaming, and ADA-compliant assistive listening.

The renovated Gant Building will stand as a keystone to the future of UConn’s position as a top public institution for scientific research. Construction on the project will start in July 2017.

UConn Health Academic Building - Farmington, Conn. UConn Health Academic Building - Farmington, CT

University of Connecticut Health Academic Building, Farmington, Conn. As part of the BioScience Connecticut state initiative, UConn Health received funds to renovate and expand its facilities at the Schools of Medicine and Dental Medicine on the Farmington, Conn. campus. Collaborating with Centerbrook Architects on the project, Acentech is providing audiovisual systems design, architectural acoustics, and mechanical system noise and vibration control consulting.

This academic building addition and renovation project includes a 19,000 s/f addition and 4,500 s/f renovation to the existing building. The centerpiece of the addition is a Team Based Learning Studio (TBLS) in the round, with seating for up to 400 in a more traditional lecture style. Indicative of the University’s transition from traditional classrooms to the new “flipped classroom” model, the TBLS is an impressive multi-purpose space with a primary set-up for small group class discussion. When UConn Health requires the room to be set up for a more formal lecture or presentation, the space can easily reset to 400 seats, all with a full view of the projection screen. To minimize distractions, sheer curtains are available to cover the unused screens. The room can additionally be used for more formal events and banquets.

The circular design of the TBLS created several challenges for Acentech’s audiovisual consultants. Chiefly: where to place the “front” of the room, especially where students are seated at round tables spread throughout the space? To solve this problem, three large, curved flush-mounted projection screens were specified, each large enough to cover the entire room. Three laser-illumination video projectors are mounted within the decorative “starburst” feature in the center of the ceiling. The starburst was robustly designed and lined with acoustically absorptive materials to isolate and absorb projector fan noise. The TBLS also features a class capture system that allows lectures to be streamed live, recorded, and shared (VoD). This system includes three cameras, located beneath each of the projection screens, as well as speech reinforcement for the presenter and wireless microphones on each of the student tables. 

Acentech has participated in more than a dozen projects helping the University of Connecticut create modern, acoustically sound, and technically advanced learning spaces, including: Biology and Physics Building Lecture Halls, Storrs; Central Cogeneration Chiller, Storrs; Energy Facility, Storrs; Gant Data Center A/C Units, Storrs ; Andrology Laboratory Vibration Monitoring, Farmington; Cell and Genome Sciences Addition Research Tower, Farmington; Honors Residence Hall and Dining Hall, Storrs; Jorgensen Auditorium Renovations, Storrs; McMahon Dining Hall, Storrs; Medical Center Vibration Monitoring, Farmington; Lakeside Chiller Noise Control, Storrs; and Next Generation Connecticut Residence Hall, Storrs.

Acentech understands that learning and innovation can happen in a traditional lecture hall, around a seminar table, or across the state or the world. The use of technology in a properly designed and acoustically appropriate physical space can assist and enhance educational experiences and make them available to an even greater and more diverse set of students. Acentech’s audiovisual consultants design systems that enable educators to capture lessons and promote the sharing and collaboration of ideas in active learning classrooms and lecture halls. Acentech’s acoustics and vibration control consultants work with design teams to create or improve the physical spaces where higher education learning occurs. To date, Acentech has collaborated with design teams on hundreds of projects that help education clients provide the most conducive learning environments.

MORE FROM Construction Design & Engineering

Weston & Sampson earns award from ACEC for Arlington DPW job

Arlington, MA Weston & Sampson Engineers, Inc., has earned a National Recognition Award for exemplary engineering achievement in the American Council of Engineering Companies’ (ACEC) 58th annual Engineering Excellence Awards (EEA).
READ ON THE GO
DIGITAL EDITIONS
Subscribe
Columns and Thought Leadership
Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

The answer is “Yes!” While January marks the official new year, many businesses view September as a fresh start. This makes summer an ideal time for commercial property owners to schedule long-term electrical maintenance projects.
The rise of incubators and co-working spaces: The latest in life sciences - by Matt Combs

The rise of incubators and co-working spaces: The latest in life sciences - by Matt Combs

In recent years, the life science industry has witnessed a shift in how companies operate and innovate. One of the key driving forces behind this transformation is the emergence of incubators and co-working spaces specifically tailored to meet the unique budget and schedule needs of startups.
The design-build advantage: Integrated interior design solutions - by Parker Snyder

The design-build advantage: Integrated interior design solutions - by Parker Snyder

When it comes to corporate interior spaces for both commercial and industrial projects, partnering with a design-build firm with in-house interior design services can offer clients many benefits. Unlike traditional delivery methods where interior designers operate independently from the design and construction teams, often creating a longer project timeline as cost negotiations and revisions ensue
Careers in Construction Month focus on training and safety - by Joe Camilo

Careers in Construction Month focus on training and safety - by Joe Camilo

October is Careers in Construction Month, and rarely has it been more consequential. According to our chapter’s national parent organization, the construction industry needs to attract half-a-million new workers in the coming year to meet demand. Addressing that need is a huge job, but we at ABC MA are trying to do our part.