News: Construction Design & Engineering

Acella Const. completes 2,000 s/f Row House at 25 Lovejoy Wharf

 

 

Boston, MA Acella Construction Corp. has completed Row House at Lovejoy Wharf, located at 25 Lovejoy Wharf.

The 2,000 s/f boutique indoor rowing studio, complete with restrooms, two showers and a lobby/retail area, is located in the booming Lovejoy Wharf; the 15-story residential property overlooks Boston Harbor.  It is the first Boston location of the indoor rowing franchise which was founded in 2014 in New York.  

Specialty doors and insulation, double wall construction and Superior Performance Surfacing athletic flooring were required throughout the Row House, as it was necessary to create a soundproof studio due to the location of adjacent residential rental units.

Row House at Lovejoy Wharf is one of several fitness-oriented projects completed by Acella Construction.

“As a result of consumer demand, an increasing number of fitness construction concepts are being introduced,” said Ryan LaVangie, vice president of sales and marketing at Acella Const.  “We’re pleased to be a leader in bringing these models to fruition.”

“We’re so excited to come to Boston, and are so grateful to Acella Construction for their beautiful work and commitment to making this happen,” said Gyee O’Malley, Boston area developer for Row House.  “We had some unforeseen issues come up on our end during the project, and Acella was fantastic about communicating, working together, and determining solutions that kept us on schedule.”

Sam Koonce and Ben Revelson of Atlantic Retail brokered the transaction between Row House and Lovejoy Wharf landlord Related Beal.

Rowers work in synchronized motion in a team-oriented contemporary space where the walls are emblazoned with empowering messages, such as “further together” and “be your strongest.”  Lights are turned low in contrast to music selected to motivate each rower to do their personal and team best.

The low impact 45-minute workout is designed to build muscle, burn calories and strengthen rowers’ cores, blending low-impact cardio, resistance training, stretching and rhythm-based rowing.

MORE FROM Construction Design & Engineering
Construction Design & Engineering

Weston & Sampson earns award from ACEC for Arlington DPW job

Arlington, MA Weston & Sampson Engineers, Inc., has earned a National Recognition Award for exemplary engineering achievement in the American Council of Engineering Companies’ (ACEC) 58th annual Engineering Excellence Awards (EEA). The award comes for leading the renovation of the Arlington Department of Public Works (DPW) facility.
READ ON THE GO
DIGITAL EDITIONS
Subscribe
Columns and Thought Leadership
Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

Ask the Electrician: Is summer a prime time for commercial electrical maintenance?

The answer is “Yes!” While January marks the official new year, many businesses view September as a fresh start. This makes summer an ideal time for commercial property owners to schedule long-term electrical maintenance projects.
State legislature ends session without passing PLA bill - by Joe Camilo

State legislature ends session without passing PLA bill - by Joe Camilo

Massachusetts taxpayers dodged a bullet when the state Senate didn’t take up legislation passed by the House in the waning moments of the legislative session that would have made it easier for municipalities and state agencies to use union-only project labor agreements (PLAs) on construction projects.
Ask the Electrician:  How do I prepare my commercial building for a disaster?

Ask the Electrician: How do I prepare my commercial building for a disaster?

New England’s notorious weather – from fierce winter storms to summer squalls and fall hurricanes – can leave businesses in the dark. While power outages are often blamed on storms, they can also be caused by unforeseen events like accidents or construction mishaps. While it’s impossible to prevent disasters and power outages entirely, proactive preparation can significantly minimize their impact on your commercial building.
The design-build advantage: Integrated interior design solutions - by Parker Snyder

The design-build advantage: Integrated interior design solutions - by Parker Snyder

When it comes to corporate interior spaces for both commercial and industrial projects, partnering with a design-build firm with in-house interior design services can offer clients many benefits. Unlike traditional delivery methods where interior designers operate independently from the design and construction teams, often creating a longer project timeline as cost negotiations and revisions ensue